Laserfiche WebLink
Table 1 <br /> Analytical Data for Soil Samples-Chemical Parameters <br /> Former Colombo/Toscana Bakery <br /> 1444 South Lincoln Street <br /> Stockton,California 95206 <br /> Sampling Depth TPH-g Benzene Toluene Ethylbenzene Xylenes MTBE DIPE ETBE TAME TBA EDB Lead <br /> Sample Location Sample ID Date (ft.BGS) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) (mg/kg) <br /> Two 4,000-Ballon Gasoline UST Excavation Samples <br /> Western end of northern UST TKI W 2/15/1994 13 6,300 <5 42 50 310 NA NA NA NA NA 0.13 9 <br /> Western end of southern UST TK2 W 2/15/1994 13 2,900 <2.5 14 21 120 NA NA NA NA NA 0.08 <5.0 <br /> Eastern end of northern UST TKI E 2/15/1994 13.5 <2.5 <0.0050 <0.0050 <0.0050 0.013 NA NA NA NA NA <0.0050 <5.0 <br /> Eastern end of southern UST TK2 E 2/15/1994 13 <2.5 0.0086 <0.0050 <0.0050 <0.0050 NA NA NA NA NA <0.0050 <5.0 <br /> Fuel dispenser area Line#1 2/15/1994 3 <2.5 <0.0050 <0.0050 <0.0050 <0.0050 NA NA NA NA NA <0.0050 15 <br /> Soil Borine Samples <br /> MW-1 MW-1-16 2/6/1996 16-16.5 <1 0.015 0.020 <0.005 0.011 NA NA NA NA NA NA NA <br /> MW-1 MW-1-26 2/6/1996 26-26.5 <1 0.026 0.060 0.010 0.067 NA NA NA NA NA NA NA <br /> MW-1 MW-1-36 2/6/1996 36-36.5 130 0.39 1.8 1.2 5.5 NA NA NA NA NA NA NA <br /> VE-1 VE-1-5 2/6/1996 5-5.5 27 0.66 1.4 0.43 2.1 NA NA NA NA NA NA NA <br /> VE-1 VE-1-21 2/6/1996 21-21.5 13,000 44 480 180 910 NA NA NA NA NA NA NA <br /> VE-1 VE-1-26 2/6/1996 26-26.5 4,900 25 220 70 360 NA NA NA NA NA NA NA <br /> VE-1 VE-1-36 2/6/1996 36-36.5 1,400 11 63 20 100 NA NA NA NA NA NA NA <br /> SB-I SB-1-16 2/7/1996 16-16.5 <1 0.026 0.021 0.007 0.038 NA NA NA NA NA NA NA <br /> S13-1 SB-1-26 2/7/1996 26-26.5 <1 0.089 0.10 0.006 0.034 NA NA NA NA NA NA NA <br /> SB-1 SB-1-36 2/7/1996 36-36.5 3 0.33 0.35 0.063 0.24 NA NA NA NA NA NA NA <br /> SB-2 SB-2-16 2/7/1996 16-16.5 <1 0.021 0.027 0.008 0.048 NA NA NA NA NA NA NA <br /> SB-2 SB-2-26 2/7/1996 26-26.5 250 0.32 2.2 2.7 19 NA NA NA NA NA NA NA <br /> SB-2 SB-2-35 2/7/1996 35-35.5 170 0.590 2.5 1.8 8.4 NA NA NA NA NA NA NA <br /> MW-7 MW-7,34.5- 10/27/1997 34.5 390 2.3 14 8.5 43 <10/0.052 1 <0.020 <0.020 <0.020 <0.020 NA NA <br /> MW-7 MW-7,46' 10/27/1997 46 19 2.9 3.6 0.31 1.5 <0.10/<10 NA NA NA NA NA NA <br /> MW-7 MW-7,53.5' 10/27/1997 53.5 4.0 0.52 0.79 0.081 0.37 <0.050/<0.050 NA NA NA NA NA NA <br /> MW-7 MW-7,63.5' 10/27/1997 63.5 <1.0 0.085 <0.0050 0.014 0.017 <0.050/<0.050 NA NA NA NA NA NA <br /> MW-7 MW-7,73- 10/27/1997 73 <1.0 0.041 <0.0050 <0.0050 0.0080 <0.050/<0.050 NA NA NA NA NA NA <br /> MW-7 MW-7,79' 10/27/1997 79 1.1 0.061 0.140.030 0.15 <0.050/<0.005 0.007 <0.005 <0.005 <0.005 NA NA <br /> Page 1 of <br />