i <br /> Mr. Ron Rowe <br /> June 2, 1997 <br /> Page 5 <br /> 3.5 Quarterly Groundwater Monitoring <br /> Following this phase of additional Site investigation,SECOR will initiate quarterly groundwater monitoring <br /> and reporting activities for the three Site monitoring wells. Groundwater monitoring activities will be <br /> coordinated with the SJCEHD so that collected groundwater elevation and chemical data can be obtained on <br /> the same day as the data collected from the surrounding properties with petroleum hydrocarbon-impacted <br /> groundwater. Groundwater monitoring activities will include well sounding,purging and sample collection, <br /> and laboratory analysis for TPHg,BTEX, and MTBE. <br /> 4.0 LABORATORY ANALYSIS <br /> SECOR will submit two to three soil samples from each of the boreholes and one groundwater sample from <br /> wells MW-1,MW-2 and MW-3 to a state-certified analytical laboratory for chemical analysis under chain-of- <br /> custody documentation. Analytes will include total petroleum hydrocarbons as gasoline (TPHg) by EPA <br /> Method 8015, modified and benzene, toluene,ethylbenzene, and xylenes (BTEX)and methyl tertiary butyl <br /> ether(MTBE)by EPA Method 8020. Soil cuttings,groundwater,and decontamination wastes will be properly <br /> disposed pending completion of laboratory analyses. <br /> Influent and effluent vapor samples collected during the SVE/AI pilot test will also be submitted to a state- <br /> certified analytical laboratory under chain-of-custody documentation. Analytes will include TPHg and BTEX <br /> by EPA Methods 8015,modified and 8020. <br /> 5.0 REPORTING <br /> SECOR will prepare and submit a Summary Report summarizing the procedures and results of the additional <br /> Site investigation and SVE/AI pilot test. The Summary Report will include text, tables, figures, and <br /> appendices documenting the field activities and the investigation and testing results, as well as integrate <br /> existing Site and Site vicinity data. The Summary Report will include recommendations for additional Site <br /> investigative and/or remedial activities,if warranted. <br /> Groundwater monitoring reports will be prepared and submitted to the SJCEHD on a quarterly basis. These <br /> reports will document groundwater monitoring activities and will include supporting tables, figures, and <br /> appendices, as required by the SJCEHD. <br /> 6.0 SCHEDULE <br /> SECOR is prepared to begin work immediately upon approval of this Work Plan from the SJCEHD. The <br /> preliminary field activities will require approximately two weeks to complete. Drilling, soil sampling, well <br /> installation, development and sampling will require one week to complete. The SVE/AI pilot test will be <br /> scheduled for the following week. Laboratory analyses will require two weeks from the sample submittal time. <br /> A Summary Report will be submitted to the SJCEHD within four weeks of receipt of all analytical data from <br /> the laboratory. Groundwater monitoring and reporting activities will be performed quarterly for one year. <br /> H:\SFFB\STOCKTON\WPLN.RPT <br /> 50090-011-03,001 <br />