My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:18:52 AM
Creation date
2/28/2020 8:40:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR <br /> HEALTH AND SAFETY PLAN <br /> REVIEW AND APPROVAL <br /> CLIENT:San Francisco French Bread Co. SITE NAME: SFFB Stockton <br /> PROJECT NAME: SFFB Stockton PROJECT NUMBER:50090-011-03 <br /> START DATE:May 31 1997 END DATE: Ongoing <br /> PLAN EXPIRATION DATE: May 31 1998 <br /> (Last day of expected field work or no longer than 6 months). <br /> Nancy A. Bond Signature: Date: 5ILl -f <br /> Plan Completed By <br /> Nancy A Bond Signature: Date: 5 Z��1,l <br /> Project Manager <br /> Daniel E. Madsen Signature: Ad <br /> Health and Safety Coordinator <br /> Liping Zhang Signature: Date: 2 <br /> Site Health and Safety Officer <br /> This Health and Safety Plan has been written for the use of SECOR and its employees. It may also be used <br /> as a guidance document by properly trained and experienced SECOR subcontractors. However,SECOR does <br /> not guarantee the health or safety of any person entering this site. <br /> Due to the potential hazardous nature of this site and the activity occurring thereon, it is not possible to <br /> discover,evaluate,and provide protection for all possible hazards which may be encountered. Strict adherence <br /> to the health and safety guidelines set forth herein will reduce,but not eliminate,the potential for injury at this <br /> site. The health and safety guidelines in this Plan were prepared specifically for this site and should not be <br /> used on any other site without prior research by trained health and safety specialists. <br /> SECOR claims no responsibility for its use by others. The Plan is written for the specific site conditions, <br /> purposes,dates, and personnel specified and must be amended if these conditions change. <br /> H AS HMSTOCKTO NUNCOLNI HS <br />
The URL can be used to link to this page
Your browser does not support the video tag.