My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:18:52 AM
Creation date
2/28/2020 8:40:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN FRANCISCO FRENCH BREAD,STOCKTON,CA SECOR Project No.50090-011-03 <br /> B. Action Level Table for Chemical Monitoring* <br /> MONITORING <br /> FREQUENCY/ <br /> LOCATION <br /> CHEMICAL MONITORING (source, area or LEVEL FOR LEVEL FOR WORK <br /> (OR CLASS) EQUIPMENT TASK NO. breathing zone). RESPIRATOR USE STOPPAGE <br /> Volatile organics Thermo 2-5 Continuous. Sample at 25 ppm-breathing 250 ppm-breathing <br /> Environmental 580B source. If>ppm sample zone(and benzene zone or 500 ppm - <br /> Photoionization breathing zone. tube non-detect). source. <br /> Detector: 10.2 ev <br /> lamp set for maximal <br /> response to benzene <br /> BTEX (benzene) Drager 0.5/a benzene 2-5 IF PID > 5 ppm in Any tube 2 ppm -breathinCT zone. <br /> tube. breathing zone. discoloration. <br /> *Record peak readings every 3Q minutes, or more frequently as necessary. <br /> •Set alarm on instrument at 25 pm <br /> *Calibrate equipment every d <br /> *Leak check colorimetric tube pump daily. <br /> *Complete Attachment 5(Air Monitoring Equipment Calibration/Check Log)and Attachment 6 (Air Monitoring Log). <br /> HASHMSTOCKTONUNCOLNIHS -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.