Laserfiche WebLink
Rantec <br /> Monthly Status Report - April 2013 <br /> Chevron Facility #92033 - Stockton Charter Way Commingled Plume No . CP0057 <br /> May 14, 2013 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec' s contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this work plan was prepared and applicable to the location of the Site . It was <br /> prepared for the exclusive use of ARCO , Chevron , Sara Lee , and Shell for the express purpose <br /> stated above . Any re- use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec , To the extent that this report is based <br /> on information provided to Stantec by third parties , Stantec may have made efforts to verify this <br /> third party information , but Stantec cannot guarantee the completeness or accuracy of this <br /> information . The opinions expressed and data collected are based on the conditions of the Site <br /> existing at the time of the field investigation . No other warranties , expressed or implied are <br /> made by Stantec. <br /> Prepared by : Reviewed By : <br /> fwcf <br /> se Y Aparjeet Rangi <br /> Engineering Associate Engineering Associate <br /> Information , conclusions , and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Reviewed By: Licensed Approver : <br /> Q\�,OF ESSlp4, <br /> LAWS <br /> Dan Schreiner, P . G . rik La n , P . E . 663 71 <br /> Senior Geologist Senior Engineer * EXP . 06 - 30- 14 <br /> May 14 , 2013 sTq c i v 11 - <br /> lF OF CAO, <br /> Stockton Charter Way Commingled Plume Monthly Status Report - April . doc 6 <br />