Laserfiche WebLink
24 July 2002 <br /> AGE-NC Project No. 02-0948 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Daniel W. Kalmbach Collect soil; direct drilling <br /> FIELD CREW: TASK: <br /> GeoProbe Operator Advance borings <br /> Field Technician if nec. Clean equipment <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around waist: Leave area immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> 8.0. EMERGENCY MEDICAL CARE <br /> Lodi Memorial Hospital located at 975 South Fairmont Avenue and is approximately 5 minutes <br /> from the site. Route to the hospital: From the site, south on N. Sacramento Street then west on W. <br /> Elm Street then south on N.Hutchins Street continue as road changes to S.Hutchins Street,then west <br /> on W.Vine Street then south on S.Fairmont Avenue hospital is on the west side of Fairmont Avenue. <br /> A map depicting the route to this facility is attached. <br /> Local ambulance service is available at phone 911. Their response time is 4 to 6 minutes. <br /> Advanced GeoEnvironmental,Inc. <br />