My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2004 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 9:16:18 AM
Creation date
2/28/2020 11:57:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2012
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-SWP.CB, 'anuary 2002 Page 1 of 2 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: r UDC Manufacturer C Industry Standard r Professional Engineer <br /> r" Other(Specify) <br /> Test Method Used By: r Pressure r" Vacuum ro Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used:VPLT Equipment Resolution: <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: unknown uknown unknown unknown <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30.00 30.00 30.00 30.00 <br /> Height from UDC Bottom to Top of 15.00 15.00 15.00 15.00 <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowes[ 3.00 3.00 3.00 3.00 <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Testedt 17 17 17 1 7 <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product and r Yes r Nor NA l Yes f No r* NA r Yes I No IT* NA f Yes r No(% NA <br /> water)?• <br /> Turbine shutdown response time SEC sec sec sec <br /> Is programmed for Fall-safe <br /> shutdown?- (` Yes r No r NA f Yes rNo r+ NA �' Yes r No 9 NA r Yes(_ o G_ NA <br /> shutdown <br /> Was fail-safe verified to be operational?` r' Yes r Nor NA r Yes r Nor NA r' Yes r Nor NA r-" Yes r" Nor NA <br /> Wait time between applying 5 min <br /> Pressure/vacuum/water and starting test 5 mitt 5 min 5 min <br /> Test start nme: 13:22:00 13:22:00 14:15:00 14:16:00 <br /> Initial Reading(Rt): 0.00000 in. H2O 0.00000 in. H2O 0.00000 in. H2O 0.00000 in. H2O <br /> Test End Time: 13:37:00 13:37:00 14:30:00 14:31:00 <br /> Final Reading(RF): -0.00050 In. H2O -0.00050 In. H2O -0.00030 in. H2O -0.00050 in. H2O <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change In Reading(RF-RI): -0.00050 In. H2O -0.00050 In. H2O -0.00030 In. H2O -0.00050 In. H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/- 0.00200 +/- 0.00200 +/-0.00200 <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? r- Yes r Nor NA r. Yes (� No r NA r. Yes r Nor NA r Yes r-" No f— NA <br /> Was sensor property replaced and r Yes r, NO NA rr Yes (-' Nor NA r: Yes r' Nor' NA <br /> verified functional after testing? Yes r+ NO NA r <br /> Comments?(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 7 <br /> �..............._............ .. _.._..... <br /> _.._._...... ------ <br /> t If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions Indicated with an asterisk(*) Is?NO?or?NA?, the <br /> entire UDC must be tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.