CAU I IUNo ! !- I H15 SHEL I I5 ICU ! JU�� x4��• II 15 A I-� E000LU I--' I� I �i
<br /> ABBREVIATIONS
<br /> GENERAL PROJECT NOTES
<br /> 04
<br /> & And F.A. Fire Alarm PL. DRAWING NOTES:Pre-cast GENERAL NOTES: Q W
<br /> L Angle F.B. Flat Bar PL. Plate 114 F3 3 FF C) j C; [Eo
<br /> F.D. Floor DrainiC) L� 0�_4 -
<br /> S F- u
<br /> ru
<br /> At P.LAM. Plastic Laminate 1. THIS PROJECT AND ALL WORK ASSOCIATED WITH PROJECT SHALL CONFORM TO 1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS z
<br /> Centerline EDN. Foundation PLAS. Plaster OCU
<br /> STATE AND LOCAL CODES AND ORDINANCES HAVING JURISDICTION OVER THIS SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH w
<br /> F.E. Fire Extinguisher :2 �
<br /> 9 PLYWD. Plywood PROJECT. w
<br /> Diameter or Round F.E.C. Fire Extinguisher Cab PR. Pair OR CENTERLINE OF GRIDS, :2 .0
<br /> Pound or Number F.H.G. Fire Hose Cabinet PT. Paint 2. THE TERM "ARCHITECT" OR "DESIGNER" AS USED IN THESE DOCUMENTS REFERS 2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB U.O.N.
<br /> w i
<br /> {E) Existing FIN. Finish
<br /> P.T.D Paper Towel Dispenser TO WARE MALCDMB.
<br /> FL. Floor P.T.D/R Combination Paper Towel
<br /> 3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED
<br /> ACDUS Acoustical FLASH. Flashing PTH. Partition
<br /> FLUOR. Fluorescent
<br /> 3. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE FROM DRAWINGS. LARGE. SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER =
<br /> U
<br /> =A.D. Area Drain P.T.R. Paper Towel Receptacle RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE OF SMALLER SCALE DRAWINGS,
<br /> ADJ. Adjustable F.O.C. Face of Concrete P.J. Panel Joint PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS W CONNECTION WITH
<br /> EEo � O
<br /> AGGR. Aggregate F.O.F. Face of Finish
<br /> F.O.M. Face of Mullion THE WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE 4. THE TERM "ALIGN", A5 USED IN THESE DOCUMENTS, SHALL MEAN TO EE X IP /k 11 4 3 1 j � �
<br /> AL. Aluminum Q.T. Quarry Tile CONTRACTOR, o4__
<br /> APPROX. Approximate F.0-SH. Face of Sheathing
<br /> ACCURATELY LOCATE FINISHES IN THE SAME PLANE.
<br /> FPRF. Fireproof R. Riser 0 .O
<br /> ARCH. Architectural P f RAD. Radius 4. THE DESIGN ADEQUACY, AND SAFETY OF ERECTION BRACING, SHORING, m
<br /> ASB. Asbestos F.S, Full Size 5. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS M
<br /> FT. Foot or Feet R.D. Roof Drain TEMPORARY SUPPORTS, ETC. DURING DEMOLITION AND/OR CONSTRUCTION IS THE THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, o
<br /> ASPH. Asphalt U �
<br /> FTG. Footing REF. Reference SOLE RESPONSIBILITY OF THE CONTRACTOR, AND HAS NOT BEEN CONSIDERED BY U.D.N. J _
<br /> $D. Board FURR. Furring REFR. Refrigerator THE STRUCTURAL ENGINEER OR ARCHITECT.
<br /> BITUM. ctp <
<br /> Bituminous FU T. Future RGTR. Register
<br /> 6, DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY O
<br /> BLDG, Building REINF. Reinforced 5. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OF PLANS _I
<br /> BLK. Block GA. Gauge REQ. Required FOR BID PURPOSES PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONQITIONS 5151 S AIRPORT WAY Q
<br /> RESIL. Resilient THROUGHOUT, U.O.N.
<br /> BLTG. $locking GALV. Galvanized RM. Roam w
<br /> 6. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR o
<br /> B.0 Beam G.B. Grab Bar R.0. Rough Opening EXAMINING CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES. w
<br /> B.O.C. Bottom of Concrete GL. Glass RWQ. RedwoodSTOCK 0 T
<br /> WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF 0
<br /> B.O.M. Bottom of Mullion CND• Ground 8. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF o
<br /> R.W.L. Rain Water Leader THERE ARE ANY QUESTIONS REGARDING THESE OR OTHER COORDINATION ITEMS, 'N CA 95206 Z
<br /> B.O.P. Bottom of Panel GR. Grade THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN
<br /> w
<br /> Bottom of Reveal GYP. Gypsum S. South THE SAME BUILDING.
<br /> ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTION OR RELATED WORK.
<br /> BOT. Bottom H.B. Hose Bibb SAF Self Adhered Flashing
<br /> S.C. Solid Core u,
<br /> CAB. Cabinet � Hollow Core 7. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES
<br /> rn
<br /> HDWD. Hardwood S.C.D. Seat Cover Dispenser ( For
<br /> TC,B. Catch Basin ("AS-BUILT DRAWINGS"} AND SHALL PROVIDE SAID DOCUMENTATION TO THE Icomprovement PHDWE. Hardware SCHED. Schedule INTERIOR 1 EXTERIOR NOTES: Only) �CEM. Cement ARCHITECT UPON COMPLETION OF CONSTRUCTION - NO EXCEPTION ALLOWED.
<br /> 0 0� o
<br /> CER. Ceramic H.M. Hollow Metal Soap Dispenser H 0 o
<br /> HR. Horizontal SECT. Section 8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE 70 COORDINATE WITH ALL 1. WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS, m u
<br /> C.I. Cast Iron SH. Shelf w � °' o � � �
<br /> C.G. Carney Guard HR. Hour SUBCONTRACTORS PER REQUIREMENTS ESTABLISHED BY OWNER, TENANT, OR DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS, m � o � M
<br /> SHR. Shower U 5n 0 0 "r 4
<br /> CLC. Ceiling HGT. Height SHT. Sheet BOTH, WHICH ARE UNDER SEPARATE CONTRACT WITH THE OWNER, OR TENANT, SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT !S o .W N
<br /> CLKG. Caulking OR BOTH. REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE PROJECT DATA 9
<br /> SHEET INDEX I.D. Inside Diameter Dim. IM. Similar CLO. Closet INSUL ( ) S.N.D. Sanitary Napkin Disp. FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS U
<br /> CLR. Clear Insulation 9. THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF
<br /> INT. Interior S.N.R. Sanitary Napkin Recept. JOB SPECIFICATIONS ARE SUPPLEMENTARY TO ARCHITECTURAL CONSTRUCTION STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR v
<br /> C_0. Cased Opening SPEC. Specification z
<br /> DRAWINGS. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECTURAL Q
<br /> Column SQ. Square BUILDING DEPARTMENT: w
<br /> C.D.M. Center of Mullion Jan. Janitor IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. ARCHITECT'S ATTENTION FOR CLARIFICATION. CITY OF STOCKTON ( 31 SHEETS
<br /> w
<br /> CONC. Concrete JT. Joint S.ST. Stainless Steel
<br /> S. Service Sink AO.1 TITLE SHEET U"-,
<br /> CONN, Connection KIT. Kitchen 10. THE INTENT OF DRAWINGS AND SPECIFICATIONS IS 70 INCLUDE ALL LABOR, 2. CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND o
<br /> K.0. Knock Out STA. Station MATERIALS AND SERVICES NECESSARY FOR THE COMPLETION OF ALL WORK LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED BUILDING CODES: 2016 CALIFORNIA BUILDING CODE AD.2 GENERAL NOTES M
<br /> CONSTR. Construction STD. Standard 2016 CALIFORNIA ELECTRICAL CODE
<br /> CONT, Continuous STL. Steel SHOWN, DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL z
<br /> C.O.R. Center of Reveal Laboratory EXPLICITLY INDICATED IN THE CONTRACT DOCUMENTS. WORK. CONTRACTOR SHALL SUBMIT A PLAN DF ALL PROPOSED ACCESS PANEL 2016 CALIFORNIA MECHANICAL CODE
<br /> A0.3 ACCESSIBILITY NOTES & DETAILS Q
<br /> STOR. Storage LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION_ 2016 CALIFORNIA PLUMBING CODE A0.3a ACCLSSiBILITY DETAILS Lj
<br /> CORR. Corridor LAM. Laminate STRL. Structural 2016 CALIFORNIA FIRE CODE
<br /> CTSK. Countersunk LAV. Lavatory 11. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT
<br /> SUSP. Suspended 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE A0.4 CAL Green REQUIREMENTS m
<br /> CTR, Counter LTR. Locker SYS. Symmetrical ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, U.O.N. 3. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN o
<br /> CTR. Center LT, Light RATING. 2016 STATE OF CALIFORNIA TITLE 24 ACCESSIBILITY STANDARDS A0.5 SITE PLAN 0
<br /> TRD, Tread 12. ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DRAWINGS, WITHOUT
<br /> T.B. Towel Bar OCCUPANCY CLASSIFICATION; A1.0 FIRST LEVEL - OVERALL PLAN
<br /> DBL. Double MAX. Maximum THE PRIOR APPROVAL OF THE OWNER AND THE ARCHITECT SHALL BE CORRECTED 4. WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR PER CBC CHAPTER 3 B / A3 / F2 / S2
<br /> T.C. To of Curb AT THE CONTRACTOR'S EXPENSE. CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL A1.0a SECOND LEVEL - OVERALL PLAN o
<br /> DEPT. Department P
<br /> M.C. Medicine TEL. Telephone
<br /> D.F. Drinking Fountain
<br /> DET. Detail MECH. Mechanical TER. Terrazzo DAMAGES CAUSED BY CONTRACTOR,
<br /> 13. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY OCCUPANCY SEPARATION: _ A1.1 FIRST LEVEL ENLARGED OCCUPANCY AND EGRESS PLAN w
<br /> MEMO. Membrane T. & G. Ton Tongue and Groove PER CBC TABLE 508.4 1-HR FIRE BARRIER WALL FOR (S2) WAREHOUSE/ (B) OFFICE �
<br /> DIA. Diameter MET. Metal g SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT 5. INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & A1.2 SECOND
<br /> T.0. Thick LEVEL ENLARGED OCCUPANCY AND EGRESS PLAN w
<br /> DIM. dimension MFR. Manufacturer WILL CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE �
<br /> DN. Dispenser T.O.C. Top of Concrete TYPE OF CONSTRUCTION: PER CBC CHAPTER 6 (SECTION 602) - V-B AD. DEMOLITION PLANS w
<br /> DN. Down MH. Manhole T.O.P. Tap of Panel CONTRACTOR SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF DENSITY RATINGS FOR FINISH MATERIALS. m
<br /> MIN. Minimum T.O.R. To of Reveal MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES, AD.2 BUILDING SECTION (FOR REFERENCE ONLY) AND M
<br /> D.O. Door Opening MIR. Mirror p 6. WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION DEMOLITION EXTERIOR ELEVATIONS
<br /> DR. Door T.O.RC. Top of Deep Recess SPRINKLERED: Q
<br /> MISC. Miscellaneous 14. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN BATTS SHALL BE NDN-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE YES A2.1 FLOOR PLANS <
<br /> DWR. Drawer M.0. MasonryOpening T.O.M. Top of Mullion WRITING AND WILL BE CONSIDERED ONLY IF BETTER SERVICE FACILITIES, A MORE OZONE DEPLETING COMPOUNDS,
<br /> DS. Downspout p 9 T.D.W. Top of Wall o
<br /> MTD. Mounted T.P. To of Pavement ADVANTAGEOUS DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE OWNER A3.1 POWER & SIGNAL PLANS z
<br /> D.S.P. Dry Standpipe p NUMBER OF STORIES: Q
<br /> MUL. Mullion T.P.D. Toilet Paper Dispenser / TENANT WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND 7. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS-FREE. {1) + (1) NEW SECOND LEVEL A4.1 REFLECTED CEILING PLANS cn
<br /> DWG Drawing p p FUNCTION. UNDER NO CIRCUMSTANCES WILL THE ARCHITECT BE REQUIRED TO z
<br /> T.V. Television
<br /> E. East N. North T.W. Top of Wall PROVE THAT A PRODUCT PROPOSED FOR SUBSTITUTION 15 OR IS NOT OF EQUAL 8• OUR FIELD VERIFICATION IS BASED ON THOSE BUILDING ELEMENTS WHICH ARE
<br /> 177-O4D-61 PARCEL NO.: A5.1 FINISH PLANS
<br /> EA. Each .I.C. Not In Contract TYP. Typical QUALITY TO THE PRODUCT SPECIFIED. IMMEDIATELY AND READILY VISIBLE WITHOUT THE USE OF DEMOLITION OR ASSESSORS 177-340-56, 177-340-55, 177-040-57, w �
<br /> E.J. Expansion Joint Number UNF. Unfinished
<br /> REMOVAL OF ANY PERMANENT ELEMENTS. A6.0 EXTERIOR AND INTERIOR ELEVATIONS
<br /> EL. Elevation NOM, Nominal U.O.N. Unless Otherwise Noted 15. PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS - A6.1 ENLARGED KITCHEN PLANS
<br /> ELEC, Electrical N.T.S. Not To Scale UR. Urinal SUBSTITUTIONS FOR SPECIFIED MATERIALS REQUIRE THE WRITTEN APPROVAL FROM PROJECT SCOPE:
<br /> THE ARCHITECT. JOB SITE NOTES: THE SCOPE OF THIS PROJECT IS APPROXIMATELY 14,740 SF NEW 2ND FLOOR ADDITION AND A6.2 ENLARGED STAIR PLAN AND SECTIONS
<br /> ELEV. Elevator VERT. Vertical APPROXIMATELY 16,932 S.F. FIRST FLOOR EXPANSION INTO EXISTING OWNER-OCCUPIEDQ
<br /> ENCL. Emergency 0.A. Overall WAREHOUSE A6.2a ENLARGED STAIR PLAN AND SECTIONS Con
<br /> VEST. Vestibule 16. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR 1• WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT, BUILDING. DEMO, NEW NDN-RATED AND FIRE RATED INTER#OR PARTITIONS, NEW ELECTRICAL, LIGHTING ■
<br /> ENOL. Enclosure OBS. Obscure THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREME NOISE AND FINISHES TO ACCOMMODATE NEW OFFICE EXPANSION, COMMERCIAL KITCHEN, ACCESSIBLE A6.2b ENLARGED STAT
<br /> W. West SHALL SUBMIT ONE {1) SET OF SHOP DRAWINGS. SHOP DRAWINGS SHOULD R PLAN AND SECTIONS o
<br /> o
<br /> E.P. Electrical Panelboard O.C. On Center CONSTRUCTION SHALL OCCUR AT NON-TYPICAL BUSINESS HOURS. CONTRACTOR MULTI-ACCOMMODATION TOILETS, AND RECREATION AND FITNESS FACILITIES, MINOR SITE ACCESSIBILITY
<br /> EQ. E ucl O.Q. W/ With INCLUDE DETAILED, FABRICATION AND ERECTION DRAWINGS, SETTING DRAWINGS, LITY A6.3 ENLARGED RESTROOM PLANS & ELEVATIONS o
<br /> q Outside Diameter (Dim.) W.C. Water Closet DIAGRAMMATIC DRAWINGS, AND MATERIAL SCHEDULES. LOCATION AND SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN UPGRADES AND MODIFICATIONS TO EXTERIOR FACADE ARE INCLUDED. w
<br /> EQPT. Equipment OFF. Office ADVANCE PRIOR TO WORK. A6.4
<br /> E.W.C. Electric Water Cooler OPNG. WD. Wood ORIENTATION OF ALL ITEMS SHOULD BE CLEARLY INDICATED. BEGIN FABRICATION ENLARGED RESTROOM PLANS & ELEVATIONS z Z
<br /> Opening HEALTH DEPARTMENT AND PLANNING REVIEWS ARE TO OCCUR SEPARATELY. w
<br /> EXST. Existing OPP. Opposite W/0 Without OF SHOP ITEMS AFTER RECEIVING ARCHITECT'S OR DESIGNER'S APPROVAL OF 2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND A6.5 ENLARGED RESTROOM PLANS & ELEVATfONS
<br /> EXPO. Exposed WPM Waterproofing Membrane SHOP DRAWINGS.
<br /> SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE 1N MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL DRAWINGS ARE INCLUDED WITH THIS A6,6 Lij
<br /> MILLWORK ELEVATIONS w CV
<br /> EXP. Expansion WRB Wheather/Water SUBMITTAL. a- 0 �
<br /> EXT. Exterior Resistive Barrier CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND A6.7 INTERIOR ELEVATIONS & DETAILS w
<br /> 17. THE ARCHITECT'S REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE THE GENERAL REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. w Lo
<br /> WSGT. Wainscot CONTRACTOR OR SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM
<br /> A7.1 DOOR SCHEDULE
<br /> WT. Weight THE DRAWINGS OR SPECIFICATIONS UNLESS HE HAS, IN WRITING, AND BROUGHT 3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE TENANT OCCUPANCY: EXISTING WAREHOUSE AREA: 395,691 SF Q
<br /> TO THE ATTENTION OF THE ARCHITECT SUCH DEVIATIONS AT THE TIME OF THE SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE EXISTING OFFICE AREA: 18,855 SF A8.1 DETAILS O 3- LL {)
<br /> SYMBOLS
<br /> SUBMISSION, NOR SHALL IT RELIEVE HIM {GENERAL CONTRACTOR) FROM LOCATION OF DISPOSAL SITES, A8.2 DETAILS RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP DRAWINGS. NEW OFFICE AREA FIRST FLOOR ADDITION: 16,932 SF A8.3 DETAILS `" z
<br /> 4. CONTRACTOR SHALL. BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB NEW OFFICE AREA SECOND FLOOR ADDITION: 14,740 SF A8.4 DETAILS o O
<br /> 18. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT TOTAL AREA OF WORK: 31,672 SF
<br /> REQUIRED BUILDING PERMITS PRIOR TO STARTING CONSTRUCTION. NOT BE LIMITED To, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE �-
<br /> TOTAL AREA: 446,218 SF w
<br /> A PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND
<br /> ALIGN INTERIOR ELEVATION VIEW 19. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT SHALL HAVE CORRIDOR CARPETS. M�A . STRUCTURAL � rn v
<br /> EVIDENCE OF CURRENT WORKMAN'S COMPENSATION INSURANCE COVERAGE ON (10 SHEETS z `''
<br /> X INTERIOR ELEVATION REFERENCE w � O
<br /> FILE WITH THE STATE LABOR DEPARTMENT IN COMPLIANCE WITH CURRENT LABOR 5• THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED 51.01 GENERAL NOTES "C'- �,.._
<br /> OFFICE Q XX B SHEET NUMBER CODES. PER STATE AND LOCAL CODES.
<br /> FFIC
<br /> ROOM NAME S1.02 TYPICAL DETAILS0
<br /> 0000ROOM NUMBER 5'
<br /> C 20. PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN STATE AND LOCAL CODES 6. IF TRENCHES OR EXCAVATIONS -0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN S2.O1 PARTIAL FIRST FLOOR / FOUNDATION FRAMING PLAN C13r
<br /> AND PER CONTRACT DOCUMENTS AS NEEDED. ISSUANCE OF A BUILDING OR GRADING PERMIT. o
<br /> WALL MATERIAL TYPE S2.02 SECOND FLOOR FRAMING PLAN v U) LO
<br /> B J
<br /> 21. PRIOR TO THE ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY FOR THIS 7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING 52.03 PARTIAL ROOF FRAMING PLAN a
<br /> 1 TYPE NUMBER PROJECT, THE GENERAL CONTRACTOR SHALL SUBMIT A SIGNED CERTIFICATE TO WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & �
<br /> DOOR NUMBER H 53.01 FOUNDATION DETAILS w DEPARTMENT OF BUILDING AND SAFETY STATING THAT ALL WORK HAS BEEN COUNTY REQUIREMENTS, ac
<br /> r-1-0-1 PERFORMED AND MATERIALS INSTALLED ACCORDING TO THE PLANS AND
<br /> 54.01 FLOOR FRAMING DETAILS
<br /> C FLOOR MATERIAL TYPE SPECIFICATIONS AFFECTING NON-RESIDENTIAL ENERGY. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN S4.D2 STAIR DETAILS =
<br /> 1 TYPE NUMBER AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING
<br /> 20
<br /> . CONTRACTOR SHALL VERIFY ALL BUILDING STANDARDS WITH BUILDING LANDLORD AIR DISTRIBUTION SYSTEMS. S4.03 STAIR DETAILS
<br /> EXISTING DOOR PRIOR TO BEGINNING ANY WORK, HOWEVER, THERE SHALL BE NO DEVIATIONS S5.01 MOMENT FRAME ELEVATIONS AND DETAILS
<br /> PL MISC. MATERIAL TYPE WHATSOEVER FROM THE CONTRACTOR DOCUMENTS WITHOUT THE ARCHITECT'S 9. BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE 56.01 MISCELLANEOUS DETAILS
<br /> TYPE NUMBER w
<br /> 1 WRITTEN APPROVAL THEREOF. THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY DONE SO IN ACCORDANCE WITH STATE & LDCAL CODES. w
<br /> AND HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS ARISING AS A RESULT
<br /> OF APPROVED CHANGES. 10. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE <
<br /> X DETAIL REFERENCE / XXX KEYNOTE INDICATOR SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES. >-
<br /> XX SHEET NUMBER /` MECHANICAL m
<br /> 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE
<br /> ( 11 SHEETS )
<br /> BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS MO.1 MECHANICAL-SYMBOLS, NOTES, AND ABBREVIATIONS X
<br /> XXX FINISH INDICATOR COMPLETED,
<br /> X
<br /> M1.1 MECHANICAL-SCHEDULES iz LLJ
<br /> DETAIL SECTION REFERENCE M1.1
<br /> MECHANICAL-SPECIFICATIONS a
<br /> XX SHEET NUMBER REVISION
<br /> M2.2 MECHANICAL-SPECIFICATIONS of
<br /> M3.1 MECHANICAL-FIRST FLOOR DEMOLITION PLAN w
<br /> MECHANICAL-ROOF DEMOLITION PLAN
<br /> - DETAIL SECTION REFERENC
<br /> XX X E M3.2 Lu
<br /> SHEET NUMBER
<br /> M4.1 MECHANICAL-FIRST FLOOR NEW WORK PLAN z
<br /> FIRE EXTINGUISHER CABINET ¢
<br /> M4.2 MECHANICAL-SECOND FLOOR NEW WORK PLAN z
<br /> W/ FIRE EXTINGUISHER Q
<br /> M4.3 MECHANICAL-ROOF NEW WORK PLAN
<br /> X EXTERIOR ELEVATION REFERENCE o WALL-MOUNTED FIRE
<br /> M7.1 MECHANICAL-DETAILS
<br /> XX SHEET NUMBER
<br /> EXTINGUISHER MB.1 MECHANICAL-TITI-E 24 DOCUMENTATION w
<br /> no
<br /> I-
<br /> o w
<br /> VICINITY MAP O ELECTRICAL ( 1a SHEETS a W
<br /> INNER 1 TENANTCONSULTANTSLIJ
<br /> ARCHITECT DEFERRED SUBMITTALS. EO.1 ELECTRICAL-SYMBOLS NOTES AND
<br /> ABBREVIATIONS o
<br /> DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT E1.1 ELECTRICAL-PANEL SCHEDULES (0
<br /> AND ENGINEERS OF RECORD WHO SHALL REVIEW AND PROVIDE E1.2 ELECTRICAL-PANEL SCHEDULES M J
<br /> SIMPSON STRONG-TIE COMPANY NOTATION INDICATING DOCUMENTS HAVE BEEN REVIEWED AND FOUND E2.1 ELECTRICAL-SPECIFICATIONS Uo
<br /> WARE MALCOMB TO BE IN GENERAL CONFORMANCE WITH THE BUILDING DESIGN. J �-
<br /> I SUBMITTAL MATERIALS SHALL INCLUDE PLANS, DETAILS AND E4.1 ELECTRICAL-FIRST AND SECOND FLOOR LIGHTING PLAN
<br /> 5151 S AIRPORT WAY LOUAY SHAMROUKH ELECTRICAL ENGINEER CALCULATIONS PREPARED AND SIGNED BY A STATE REGISTERED E4.2 ELECTRICAL---FIRST AND SECOND FLOOR POWER PLAN
<br /> STOCKTON, CALIFORNIA PH: (209) 944-1094 4683 CHABOT DRIVE SUITE 300 KIRSTEN LIEN ENGINEER.
<br /> E4.3 ELECTRICAL-ROOF NEW WORK PLAN w
<br /> EMAIL:Ishamroukh@strongtie.com PLEASANTON, CA 94588 PH: (925) 480-6081 WB ENGINEERING CONTRACTOR SHALL SUBMIT ARCHITECT AND ENGINEER REVIEWED JIMMY SNEED SUBMITTAL MATERIALS TO THE BUILDING OFFICIAL FOR REVIEW AND E5.1 ELECTRICAL-ENLARGED KITCHEN PLAN ¢ ``' �
<br /> 5934 GIBRALTAR DRIVE, SUITE 100 o w � m
<br /> FAX: 925} 244-9621 PH: (925) 520-3249 PERMIT APPROVAL. DEFERRED SUBMITTAL ITEMS SHALL NOT BE E6.1 ELECTRICAL-ONE LINE DIAGRAM i- a_ © �
<br /> email: klien@woremalcomb.com PLEASANTON, CA 94588 INSTALLED PRIOR TO OBTAINING THE BUILDING OFFICIAL'S APPROVAL 2
<br /> E6.2 ELECTRICAL-LIGHTING CONTROLS o w
<br /> OF THE SUBMITTAL. o
<br /> �q MECHAINICAL ENGINEER � U
<br /> 1- AUTOMATIC FIRE SPRINKLER SYSTEM. o w r
<br /> c � z
<br /> WB ENGINEERING 2- FIRE ALARM SYSTEM.
<br /> JIMMY SNEED a cn �_ J
<br /> OBF 5934 GIBRALTAR DRIVE, SUITE 100PH: (925) 520-3249 PLUMBING ¢ m °-
<br /> 0 0� RCH PLEASANTON, CA 94588 ( 15 SHEETS )
<br /> PO.1 PLUMBING-SYMBOLS, NOTES, AND ABBREVIATIONS
<br /> LU CN
<br /> H o 1 I
<br /> GENERAL CONTRACTOR PLUMBING ENGINEER P1.1 PLUMBING-SCHEDULES
<br /> � � Op 101
<br /> N
<br /> P2.1 PLUMBING-SPECIE!CATIONS a
<br /> o c 1
<br /> WB ENGINEERING w N o �'
<br /> JIMMY SNEED P3.1 PLUMBING-FIRST AND SECOND FLOOR DEMOLITION PLANS z
<br /> v T Ld
<br /> 5934 GIBRALTAR DRIVE, SUITE 100
<br /> QP PLEASANTON, CA 94588 PH: (925} 520-3249 P3.2 PLUMBING-ROOF DEMOLITION PLAN
<br /> o OR�HRS 00�
<br /> T.B.D. P4.1 PLUMBING--FIRST AND SECOND FLOOR PLANS
<br /> Q
<br /> P4.2 PLUMBING-ROOF NEW WORK PLAN o PA/PM: M.TAYLOR
<br /> ro
<br /> STRUCTURAL ENGINEER P5.1 PLUMBING-ENLARGED PLANS 0
<br /> P5.2 PLUMBING-ENLARGED PLANS v DRAWN BY: D.S.
<br /> RIVERA CONSULTING GROUP P5.3 PLUMBING-ENLARGED PLANS
<br /> C) sn THUY DONG �
<br /> 201 MISSION STREET, SUITE 280 PH: (415) 975-5501 P6.1 PLUMBING-FIRST FLOOR RISER DIAGRAMS � JOB NO.: SNR18-6048-OD
<br /> / SAN FRANCISCO, CA 94105 FAX: (415) 357-9806
<br /> 0 PROJECT SITE
<br /> a
<br /> P6.2 PLUMBING--FIRST FLOOR RISER DIAGRAMS
<br /> N P6.3 PLUMBING-SECOND FLOOR AND ROOF RISER DIAGRAMS z SHEET
<br /> �O S�
<br /> P7.1 PLUMBING-DETAILS
<br /> z c�
<br /> P8.1 PLUMBING-TITLE 24 DOCUMENTATION Z
<br /> NO SCALE < N
<br /> C1 AOO
<br /> U
<br /> (n CD
<br /> w co
<br /> FM
<br /> -
<br />
|