0 <br /> N <br /> H <br /> COVER A. GENERAL NOTES 3. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE OR MASONRY. HANGING FROM METAL DECK IS <br /> Of <br /> 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORDS OF BAR JOISTS. WHERE INTERFERENCES <br /> o FINISHED ADJUSTING FOR WALL CONST. CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS,APPLY TO ALL SECTIONS OF DIVISION 15000. OCCUR, AND IN ORDER TO SUPPORT (DUCTWORK OR PIPING) THE CONTRACTOR SHALL INSTALL TRAPEZE TYPE <br /> U FLOOR COLLAR SEE ARCH. DWGS. 2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW THE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE <br /> A4 DRAWINGS FOR ALL DIVISIONS OF WORK PRIOR TO BEGINNING WORK AND IS RESPONSIBLE FOR THE DAMPERS,VALVES,AND OTHER EQUIPMENT. <br /> d MAY EXTEND AS CLEANOUT PLUG COORDINATION OF HIS/HER WORK AND THE WORK OF HIS/HER SUBCONTRACTORS WITH ALL DIVISIONS OF WORK 4. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. <br /> WASTE OR VENT TO AVOID INTERFERENCE AND CONFLICTS. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS/HER INSTALL 6"LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. PROVIDE <br /> � COUNTERSUNK <br /> SCREW SUBCONTRACTORS WITH COMPLETE SETS OF BID DOCUMENTS. HIGH DENSITY INSULATION INSERT BETWEEN THE SADDLE AND THE PIPE. <br /> CLEANOUT TEE 3. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF HIS/HER WORK AND 5. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. <br /> CLEANOUT PLUG RISER THE WORK OF HIS/HER SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE. <br /> AND BODY. POLISHED S.S. 4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE <br /> CL SEE SPECS. ACCESS COVER WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL I. DIRT AND DUST CONTROL <br /> N 1/8 BEND FULL d ° ° BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF A BID SHALL SERVE AS 1. SCREEN OFF ALL AREAS WHERE CONSTRUCTION IS TO TAKE PLACE FROM THE AREAS TO REMAIN INHABITED. <br /> a SIZE, 4" MAX. d ° ° EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET INHABITED AREAS SHALL REMAIN DUST AND DEBRIS FREE DURING CONSTRUCTION. <br /> 4 A i <br /> THE INTENT OF THE DRAWINGS AND SPECIFICATIONS SHALL BE INCLUDED. FAILURE TO VISIT THE SITE DOES NOT 2. CLEAN ANY AREAS OUTSIDE DESIGNATED CONSTRUCTION AREA WHICH MAY HAVE BECOME SOILED DUE TO <br /> u PLUG IF END WASTE LINE RELIEVE THE CONTRACTOR OF HIS/HER RESPONSIBILITY IN PERFORMANCE OF WORK CONSTRUCTION. JASON <br /> D <br /> OF LINE WITH LENGTH TO B. GENERAL REQUIREMENTS: J. EQUIPMENT, PIPING AND INSTALLATION <br /> 0 <br /> o FLOW� ° SUIT 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, 1. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES.AMERICAN STANDARD, KOHLER AND CRANE ARE <br /> o d m d AND FACILITIES NECESSARY TO PROVIDE A COMPLETE HVAC, PLUMBING, FIRE PROTECTION SYSTEM AS SHOWN ON CONSIDERED ACCEPTABLE AS EQUALS. <br /> N 1/8 BEND AT THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS AND AS REQUIRED BY JOB CONDITIONS. ALL WORK 2. MAINTAIN A MINIMUM CLEARANCE OF 6"BETWEEN PLUMBING PIPING AND EQUIPMENT AND ALL FIRE/SMOKE RATED GNICH <br /> ° <br /> CONCRETE ° NECESSARY AND NOT SPECIFICALLY NOTED TO BE PROVIDED BY OTHERS SHALL BE PROVIDED BY THIS WALLS. <br /> o END OF LINE ARCHITECT <br /> ENCASEMENT ° CLEANOUT CONTRACTOR. 3. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. INSTALL UNITS LEVEL AND <br /> o FLOW ° 2. ALL WORK SHALL BE PERFORMED IN A NEAT, PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES. PLUMB, FIRMLY ANCHORED IN LOCATIONS INDICATED. <br /> NOTE: WASTE LINE 3. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS AND EQUIPMENT, INCLUDING ALL 4. POTABLE WATER PIPING SHALL BE AS FOLLOWS: <br /> a COMPONENTS THEREOF, SHALL BE NEW, TESTED, LISTED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF a. BELOW GRADE: TYPE W,ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER. <br /> CLEANOUT COVER FLUSH WITH TILE OR FLUSH CONCRETE STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. BRAZE ALL JOINTS. <br /> x <br /> WITH CONCRETE FLOOR IN AREA WITH NO TILE. ° ° ENCASEMENT 4. ALL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING AND b. ALL OTHER: TYPE'L'DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5 TIN-ANTIMONY SOLDER. 9 SE 3RD AVE, SUITE 110 <br /> 3 REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. PORTLAND, OR 97214 <br /> FL 0 0 R CLEAN - 0 U T DETAIL WALL CLEAN - 0 U T DETAIL 5. FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT DIMENSION'S. OFFSETS AND ADDITIONAL ELBOWS 6. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY ENGINEER IF CONDITIONS ARE V. 503.552.9079 <br /> a REQUIRED TO SUIT SITE CONDITIONS ARE CONSIDERED PART OF THE SCOPE. NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR SHALL VERIFY THE F. 503.241.7055 <br /> SCALE: NTS SCALE: NTS OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE-IN AS FOLLOWS: WWW.GNICHARCH.COM <br /> L C. CODES c. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. <br /> •� 1. ALL WORK SHALL COMPLY WITH 2016 CALIFORNIA PLUMBING CODE ORDINANCES AND OTHER STATE, COUNTY, d. TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDING EQUIPMENT SUPPLIED. <br /> L POSITIVE SLOPE TIOGCLAMPL DEVICE..RPRO IDE NON- SHRINK SPOUT UNDER CITY AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL 7. INSULATE ALL HOT AND COLD WATER PIPING WITH 1"THICK(K=0.23 @ 75°F) FIBERGLASS PIPE INSULATION WITH AN 09• 2• 8 <br /> 3 LEAD FLASHING AS REQUIRED TO FACILITATE POSITIVE SLOPE (ANY FLASHING OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATING. INSTALL <br /> o MATERIALS OTHER THAN LEAD IS UNACCEPTABLE. MINIMUM WIDTH OF APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE IN THE BID ANY PER MANUFACTURER'S RECOMMENDATIONS. eg'�t'T •F�-,, <br /> FLASHING SHALL BE 24"). CHANGES REQUIRED BY CODES AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE 8. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORIES WITH TRUEBRO MODEL 102W "HANDI LAV <br /> E QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO GUARD"INSULATION KIT OR EQUAL. <br /> ADJUSTABLE <br /> NOTE: FINISH FLOOR CODE ISSUES SHALL BE REIMBURSED TO THE CONTRACTOR. 9. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND <br /> r STRAINER SLOPE TO DRAIN FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. <br /> ALL EXPOSED PIPING SHALL 1/2" CW 31 <br /> ° BE CHROME PLATED TO TRAP ° D. LICENSES, PERMITS AND INSPECTION FEES 10.STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. <br /> PRIMER ° ,- ° 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS AND FEES REQUIRED OR 11.TEST ENTIRE PLUMBING SYSTEM IN ACCORDANCE WITH 2016 CALIFORNIA PLUMBING CODE. ;? 6130120 <br /> CL o- ted- ° RELATED TO DIVISION 15000 WORK. 12.PROVIDE WATER METER AND REMOTE READER PER LOCAL UTILITIES REQUIREMENT, IF APPLICABLE. <br /> T <br /> o RESTROOM ' ° 2. FURNISH TO THE (OWNER)ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION 13.CONDENSATE DRAIN: PROVIDE POLYVINYL CHLORINE (PVC) SCHEDULE 40 PLASTIC PIPE (TYPE (DWV) IN :p:e <br /> o LAVATORY v moo- tee- OF PROJECT. CONFORMANCE WITH STANDARD ASTM D2665. r`�. .;. ��,T ;.' <br /> o . r'� ' ), <br /> `o_ TRAP PRIMER WITH CAST IRON - 14.VALVES: PROVIDE BALL VALVE NIBCO SERIES 585-70 FOR SHUT-OFF <br /> STOP VALVE E. GUARANTEE 15.PROVIDE ACCESS PANELS WHERE REQUIRED FOR OPERATION, MAINTENANCE AND BALANCING OR PLUMBING <br /> � CHROME FINISH PPP# FLOOR DRAIN <br /> o PRO1-ULP500 WITH 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS/HER CONTRACT AND EQUIPMENT. <br /> CL <br /> TURN TRAP PRIMER DU-4 CORE DRILL 10"0 SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS/HER OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL OR 16.PROVIDE WATER HAMMER ARRESTORS AT EACH BRANCH LINE. <br /> DRAIN LINE AND 4"0 HOLES EQUIPMENT DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE(IN WRITING) OF THE <br /> INTO WALL COLD WATER THREADED OR CAULK INSTALLATION. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. H. GAS PIPING <br /> 0 TYPE 'K' COPPER OUTLET 2. THE HOT WATER HEATERS SHALL BE FURNISHED WITH A 5 YEAR HEAT EXCHANGER WARRANTY. 1. FURNISH AND INSTALL A COMPLETE GAS PIPING SYSTEM. <br /> a KEEP MINIMU TUBING - NO JOINTS 2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-53, WITH MALLEABLE THREADED FITTINGS FOR 2"AND <br /> BELOW FLOOR OUTLET <br /> F. PHASING REQUIREMENTS(IF APPLICABLE) SMALLER,AND WITH WELDED JOINTS FOR 2-1/2"AND LARGER. <br /> 1. THIS CONTRACTOR SHALL INCLUDE IN THE BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING 3. FURNISH AND INSTALL A GAS COCK, DIRT LEG,AND UNION CONNECTION AT EACH PIECE OF EQUIPMENT. <br /> FLOOR DRAIN WITH PORTION OF THE BUILDING'S (HVAC, PLUMBING AND SPRINKLER) SERVICES IN OPERATION. CONTRACTOR MUST 4. PITCH PIPING AT A UNIFORM GRADE OF 1/4"IN 15 FEET UPWARD IN DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 I <br /> N TRAP PRIMER 1/2' NOTE: THE GENERAL CONTRACTOR SHALL PROVIDE A ONE PIECE WATER SCHEDULE IN WRITING ONE WEEK PRIOR TO ANY SHUT DOWN OF (THE HVAC, PLUMBING OR FIRE PROTECTION) FEET,AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE,WHICHEVER IS MORE STRINGENT. L <br /> CONNECTION PROOF MEMBRANE FLOOR AND BASE IN THE TOILET ROOM(S). SYSTEMS 5. GAS PIPING EXPOSED ON ROOF SHALL BE PAINTED WITH RUST-INHIBITING PAINT. <br /> THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND 6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND VENTED OR WELDED IN ACCORDANCE p <br /> TRAP PRIMER PIPING DETAIL FLOOR DRAIN W /TRAP PRIMER THE RENOVATION WORK. COORDINATE WITH THE OTHER CONTRACTORS ANY EXISTING EQUIPMENT REQUIRED TO WITH THE LOCAL GAS COMPANY, LOCAL CODE AND APPLICABLE NFPA 54 CODES. <br /> Duvdfl MIR <br /> � BE LEFT INTACT. THIS CONTRACTOR SHALL INCLUDE AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL 7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS COMPANY, /yam_ <br /> SCALE: NTS SCALE: NTS EXISTING (FIRE PROTECTION SYSTEMS, PLUMBING FIXTURES, PIPING SYSTEMS, HVAC UNITS, REFRIGERANT LOCAL CODES AND APPLICABLE NFPA CODES. <br /> RECAPTURE, EXHAUST FANS). AND ASSOCIATED ROOF CURBS OR RAILS NOT TO BE REUSED ON THIS PROJECT, 8. CONTACT AND COORDINATE GAS SERVICE, METER AND REGULATOR REQUIREMENTS WITH THE LOCAL GAS <br /> TURN FLASHING DOWN UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR SHALL VERIFY ALL PRESUMED ABANDONED (EQUIPMENT, COMPANY PRIOR TO BID. INCLUDE INSTALLATION COST OF GAS METER AND REGULATOR IN BID. <br /> 1" INTO VENT STACK PIPES, DUCTWORK AND EQUIPMENT) PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF <br /> a HEAVY-DUTY SECURED PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE, ASSOCIATED WITH THE SPACE, OR ON THE ROOF NOT I. LABELS/PIPE MARKERS <br /> EXTRA DEEP ACCESS COVER APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH 1. FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS ON ALL PIPES INSTALLED UNDER THIS CONTRACT. MARKERS <br /> EXISTING SURROUNDINGS. EXISTING ABANDONED (PIPES, DUCTS OR EQUIPMENT) IN THE FLOOR, EMBEDDED IN SHALL BE A MINIMUM OF 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND LETTER <br /> SHEET METAL GASKETED ABS CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN THE FLOOR OR COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE(ANSI). MARKERS SHALL BE MANUFACTURED <br /> FLASHING, SURFAC CLEANOUT PLUG WALL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY CODES,ABANDONED(PIPING AND/OR BY CHAMPION AMERICA INC., BRADY, SETON, OR EQUAL. <br /> MOP W/ DUCTWORK) MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CONDENSATE, REFRIGERANT LIQUID, REFRIGERANT SUCTION, AND <br /> • INCLUDE IN BID PROPOSAL. DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT <br /> ROOFING _ Al <br /> T MATERIAL A G. SLEEVE J. STEEL FRAMING FOR SUPPORT O <br /> CL � SLAB 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH 1. PROVIDE ALL NECESSARY STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED <br /> CONCRET ANCHOR FLANGES SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH ON THE DRAWINGS. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE AT THIS CONTRACTOR'S <br /> ROOFING EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2"ABOVE THE FLOOR. EXPENSE <br /> .� PIPE SIZE2. CONTRACTOR SHALL COORDINATE ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR S r1 <br /> o ACCESS COVER HATH CLEANOUT WALLS. K. SYSTEM START-UP �J (") <br /> 3. ALL SLEEVES AND OPENINGS THROUGH FIRE-RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM 1. THIS CONTRACTOR SHALL INCLUDE AS A BASE, 2-HOURS OF START-UP TIME PLUS AN ADDITIONAL 2-HOURS OF O N <br /> VENT PIPE READED COUNTERSUNK <br /> C CLEANOUT PLUG SILICATE, SILICONE "RTV' FOAM, "31VI" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE START-UP TIME PER HVAC UNIT SHOWN ON DRAWINGS. 11- <br /> O <br /> 0 OVER RATING.SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT <br /> CLEANOU STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED O <br /> CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L. FINAL INSPECTIONS N <br /> 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE ENGINEER SHALL BE NOTIFIED (IN WRITING) <br /> ° H. HANGERS TO INSPECT THE FINISHED INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS ^ ' <br /> COUNTERSUNK SCREW 1. PROVIDE HANGERS AND SUPPORTS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT IN ACCORDANCE WITH SMACNA, AND CODES. THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE ` V <br /> P SANITARY STACK-,,,",," MSS,ASME,AND ASHRAE STANDARDS. ENGINEER INTO COMPLIANCE W 3 <br /> 02. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING 00N N <br /> °' CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. z <br /> N <br /> U r_1 <br /> SLEEVE OOF CONSTRUCTION PIPE SIZE J 011 <br /> AS REQUIRED CLEANOUT TEE & ACCESS COVER O C O � <br /> VENT STACK <br /> NOTE: z CV U <br /> FIRE RESISTANT PACKING 1. INSTALL CLEAN OUTS SO BOTTOM IS AT LEAST 7"ABOVE 0 U Lo N O <br /> � <br /> "3M" OR EQUAL FINISHED FLOOR. cnQ � <br /> VENT TO ROOF DETAIL CLEAN - OUT DETAILS U 0 E U v) Ln <br /> SCALE: NTS SCALE: NTS co0 <br /> = O <br /> SHUT OFF VAL EXISTING HWR PIPE � a` U °o <br /> FULL PORT BALL VALVES O O O <br /> � C) ° � <br /> AIR RELIEF VALVE <br /> BY PLUMBING CONTRACTOR ISSUED FOR PERMIT. <br /> DRAIN LINE STRAINER BY GAS COMPANY (VERIFY) <br /> PRESSURE TEST COCK EXTERI❑R BUILDING WALL. 09. 1 2. 1 8 <br /> FLOOR GRATE TO BE \ GAS PIPE UP PENETRATE WALL <br /> FLUSH WITH GAS METER OF CFH <br /> FINISHED FLOOR NEW INLINE HWR PUMP, AS NOTED. CAPACITY SHOWN G ROUTE PIPING ABOVE CEILING <br /> VERIFY PROPER PUMP ROTATION. ON PLANS SIZE AS SHOWN ON PLAN. <br /> MOUNT FLUSH �� USE BLACK STEEL PIPE. <br /> PIPE IN FROM GAS SUPPLY WITH FINISHED CREASER ANCHOR RISER T❑ WALL AT <br /> FLOOR TEN FOOT INTERVALS USING REV: DATE: DESCRIPTION: <br /> OFFSET RISER PIPE CLAMPS. <br /> AIR GAP=2X"D" m PIPE INCREASER AND UNION <br /> (2 MIN) BYPASS VALVES <br /> SWING CHECK VALVE <br /> \ STRAINER GRADE OR PR❑VIDE 6' LONG DIRT <br /> PAVEMENT LEG AT BOTTOM OF RISER. <br /> TO APPLIANCE 1 141 FLOOR <br /> G PRESSURE REGULATOR TO REDUCE PRESSURE TO 14' WC. <br /> FULL PORT BALL VALVES � SHEET NAME: <br /> TYPICAL SHUT-OFF VALVE <br /> VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. <br /> DIRT LEG EXISTING HWR PIPE INSTALL OTHER UTILITIES MINIMUM TEN FEET FROM GAS LINE. PLUMBING PLUMBING DETAILS AND <br /> : CONTRACTOR SHALL PAY ALL GAS COMPANY FEES FOR INSTALLATION. <br /> USE WELDED OR SCREWED PIPE AND FITTINGS PER PLUMBING SPECS. GENERAL NOTES <br /> GAS COMPANY SHALL EXCAVATE, BACKFILL, AND REPAIR ANY PAVING <br /> ! HUB OUTLET OR SOD FOR GAS SERVICE LINE INSTALLATION FROM MAIN TO BUILDING. St.Louis-Montreal <br /> Rd <br /> lficacase SHEET NUMBER: <br /> X13 <br /> GAS APPLIANCE CONNECTION FLOOR SINK DETAIL HW RECIRCULATION PUMP DETAIL FLOOR SINK DETAIL 796MerusCouenglneeringrt mechanical P5 . 0 <br /> St.Louis,MO 63026 electrical <br /> SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS T 636.349.1600 plumbing <br /> F 636.349.]730 fire protection <br /> aedificacase.com structural <br /> COPYRIGHT 2018 <br />