Laserfiche WebLink
Advanced <br /> GeoEnvironmental, Inc . -o-: <br /> 17 April 2006 <br /> AGE-NC Project No. 04-1207 <br /> Ms. Lucy Thater <br /> P.O. Box 437 <br /> Acampo, California 95220 <br /> Subject: Interim Remediation and Additional Site Assessment Work Plan <br /> THATER PROPERTY(former TUCKER CONSTRUCTION) <br /> 336 East Locust Street,Lodi, California <br /> Dear Ms. Thater: <br /> In accordance with a letter from the Central Valley Regional Water Quality Control Board <br /> (CVRWQCB)dated 09 March 2006,Advanced GeoEnvironmental, Inc. has prepared this Interim <br /> Remediation Work Plan for the advancement of three exploratory soil borings to define the lateral <br /> and vertical extents of soil and ground water contamination at the site,installation of one soil vapor <br /> extraction(SVE) well, and performance of an SVE pilot test and ground water aquifer extraction <br /> (pump)test. Copies of this work plan will be transmitted to Mr. James Barton of the CVRWQCB <br /> and to Mr. Harlin Knoll of the San Joaquin County Environmental Health Department(EHD). <br /> The opportunity to provide this service is greatly appreciated. If you have any questions or require <br /> further information, please contact our office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> M. Chapman <br /> Staff Geologist <br /> Enclosure <br /> cc: Mr. James Barton, CVRWQCB <br /> \Mr. Harlin Knoll, EHD <br /> 837 Shaw Road,Stockton,California 95215 <br /> Telephone(209)467-1006 Fax(209)467-1118 <br />