Laserfiche WebLink
Interim Remediation and Additional Site Assessment Work Plan <br /> THATER PROPERTY(former TUCKER CONSTRUCTION) <br /> 336 East Locust Street, Lodi, California <br /> 1.0. INTRODUCTION <br /> In accordance with a letter from the Central Valley Regional Water Quality Control Board <br /> (CVRWQCB) dated 09 March 2006 (see Appendix A), Advanced GeoEnvironmental, Inc. has <br /> prepared this Interim Remediation Work Plan for the installation of one soil vapor extraction(SVE) <br /> well.Following the well installation,AGE will perform an SVE pilot test and ground water aquifer <br /> extraction (pump) test to determine feasibility and design parameters for soil and ground water <br /> remediation. Additionally, AGE recommends additional site assessment, prior to SVE well <br /> installation, to delineate the lateral and vertical extents of hydrocarbon-impacted soil and ground <br /> water with the advancement of three exploratory soil borings. <br /> The site and surrounding area are illustrated on Figure 1. A plan of the site, including monitoring <br /> well locations and proposed SVE well and soil boring locations, is illustrated on Figure 2. Site <br /> background information is provided in Appendix B. <br /> 2.0. GROUND WATER DEPTH AND FLOW DIRECTION <br /> Based on data collected during ground water monitoring events conducted by AGE between <br /> April 2005 and the present, first observed ground water is approximately 48 feet to 51 feet below <br /> surface grade (bsg). Ground water flow directions and gradients measured at the site have been <br /> highly variable due to an apparent mounding of the ground water table at MW-1, though ground <br /> water flow direction south of MW-1 is consistently toward the south-southwest.Calculated hydraulic <br /> gradients at the site have ranged from 0.004 foot per foot(ft/ft)to 0.07 ft/ft. <br /> 3.0. SCOPE OF WORK <br /> The proposed scope of work will consist of the following tasks: <br /> • Permitting and pre-field work preparations; <br /> • Boring advancement and soil sample collection; <br /> • Installation and development of a soil vapor extraction well; <br /> • Performance of a SVE pilot test; <br /> • Ground water aquifer extraction(pump)testing of well MW-1; and <br /> • Preparation of a report of findings. <br /> Advanced GeoEnvironmental,Inc. <br />