My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
336
>
2900 - Site Mitigation Program
>
PR0523885
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:55:30 PM
Creation date
2/28/2020 4:31:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523885
PE
2957
FACILITY_ID
FA0005984
FACILITY_NAME
THATER PROPERTY
STREET_NUMBER
336
Direction
E
STREET_NAME
LOCUST
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04311105
CURRENT_STATUS
01
SITE_LOCATION
336 E LOCUST ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 October 2006 <br /> AGE-NC Project No. 04-1207 <br /> Page 4 of 9 <br /> MW-4.AGE projected a theoretical radius of influence for MW-1 at approximately 94 feet <br /> at 2.0 GPM, 122 feet at 3.0 GPM,and 118 feet at 4.0 GPM.Laboratory analysis of extracted <br /> water detected BTEX compounds in the ground water samples collected at 0815 hr at <br /> concentrations of 4.2 µg/1 ethylbenzene and 12.6 µg/1 xylenes, and at 1000 hr at a <br /> concentration of 2.5 µg/1 xylenes.No petroleum hydrocarbon constituents were detected in <br /> the samples collected at 1200 hr or 1400 hr. <br /> 3.0. SCOPE OF WORK <br /> The CVRWQCB is requiring interim soil and ground water remediation of petroleum hydrocarbons <br /> at the site to prevent vapor migration to neighboring residences. Remediation by soil vapor <br /> extraction is proposed. Additionally, AGE proposes to install, operate, and maintain an interim <br /> ground water pump-and-treat remediation system utilizing ground water monitoring well MW-1 as <br /> the extraction point. The goals of this interim remediation effort are: <br /> • To inhibit migration of dissolved petroleum hydrocarbon-impacted ground water off-site to <br /> neighboring residences; <br /> • To decrease the adsorbed and dissolved petroleum hydrocarbon plumes; and <br /> • To protect the beneficial use ground water supply. <br /> The proposed scope of work will include the following tasks: <br /> • Pre-field work activities; <br /> • Installation of a soil vapor extraction system; <br /> • Dedicated ground water pump installation; <br /> • Soil vapor extraction system start-up period; <br /> • Pumping and discharging produced ground water; <br /> • Monitoring and maintenance activities; <br /> • Progress/confirmation sampling; and <br /> • Report preparation. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.