My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARKET
>
22
>
2800 - Aboveground Petroleum Storage Program
>
PR0527617
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 9:55:08 AM
Creation date
3/2/2020 9:00:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527617
PE
2832
FACILITY_ID
FA0001506
FACILITY_NAME
STOCKTON POLICE DEPARTMENT
STREET_NUMBER
22
Direction
E
STREET_NAME
MARKET
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14904001
CURRENT_STATUS
01
SITE_LOCATION
22 E MARKET ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> COUNTY <br /> °r='F° Greatnrss qrm+. <br /> al <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Nama: Facility PMna: Data: <br /> STOCKTON POLICE DEPARTMENT 1937-8248 February 27,2020 <br /> FacilityArkYass: CERSID: <br /> 22 E MARKET ST,STOCKTON,CA 95202 10180763 <br /> Irepectian Comad: Title: Phone: <br /> Ty Rust Safety/Training Officer p- <br /> ImPecti.nTypa: hags ' <br /> ROUTINE INSPECTION-Operating Permit 2832-AST FAC 10K-</=100 K GAL CUMULATIVE <br /> C.nseii Far: Carreent G.By: <br /> Ox Inspection Ox Photos ❑Samples I Ty Rust, Safety/Training Officer <br /> CCR=Caffmna Cool M RegulMom HSC=Al and Sadly Code CFR=Tide iO Code of Fedend fiNuldom <br /> V=mi R=RepeYWtlMan COS=Coneded on sem during <br /> or Abovegrountl Petroleum Storage Act <br /> 101 HSC 25270ad) Failed to pay APSA program annual fees oV in .COS <br /> 102 HSC 25270.4.5(.) Failed to prepare written SPCC Plan In accordance with CFR Part 112 o V o R o COS <br /> 103 HSC 25270.6(.) Failed to Me ll or arcual facility tan k statem ant o o oCOS <br /> 104 HSC 25270.8 Failed to report aside or releases of 42 gallons(one barrel)or mom o o oCOS <br /> 105 CFR 112.1(bN3),112.2 FaYure to property close tanks when makln a a claim of perman ently closed o o oCOS <br /> 106 HSC 25404.1.2 Faied to submit a call cation and written resp onse widths n 30 clays for mi nor viol atiods o o oCOS <br /> 107 HSC 25270.2(ill Faiure to prepare SPCC plan when facility no longer meets oil-filled electrical equipment exclusion o o oCOS <br /> 108 HSC 25270.4.5(.) Faiure of conditionally exempt facility to conduct lnspechads or Install secondary containment o o oCOS <br /> 10) HSC 25270.2(.X1 XC) Faitu re to have secondary containment andlor leak detection if Tlll GA pip Ing can not be viewed o o oCOS <br /> illi <br /> 110 HSC2 104mi Failed to report program data inthe California Environmental Reporting System(CERS) o o oCOS <br /> 111 HSC 25270.2(.X8) Failure of a Till wih less than 55 gallons capacity to have secondary containment and a Isg o o oCOS <br /> 112 CFR 112.20m) paid re to complete and m aintain a Sub nantial H arm Criteria certification p p .COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(4) Failureto have a licensed PE properly rehewand certifythe SPCC plan is .R .COS <br /> 202 CFR 112.3(ei Fall to mandal a copy of die Plan on site o o .COS <br /> 203 CFR 112.3 Faiture to Implement the SPCC Plan o o oCOS <br /> 204 CFR 112.3(g) Failure to prepare SPCC Plan when facility no tiger merle Qualified Facility crieria o o oCOS <br /> 205 CFR 112.3,1126 Failure to prepare SPCC Plan that meets all applicable requirements in V in R in COS <br /> 206 CFR 112.3(d)(1) Failure of owner to assure that the PE makes all required attestations In the Plan n .R .COS <br /> Amentllnent of SPCC Pim by Owners a Operettas <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary .V .R .COS <br /> 302 CFR 112.5(b) Failed to revew Plan once every Me years andlor implement my header,ammdineote in p .COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments o V o R o COS <br /> 304 CFR 112.5(a),112.5(b) Failureto Implement SPCC plan amendments wthln 6 months .V .R .COS <br /> Qualified Facility-Tia I <br /> 401 CFR 112.6(a),112.6(b) Tier I Qualified Facility Plan not certified by the owner or a PE <br /> 402 CFR 112.6(.X2) Owner ofTer l Qualified Facilltyfailed to selfcertify technical amendment .V .R .COS <br /> 403 CFR 112.6(aX3Xi) Planfaied t.prelitcleadioNrete of flowtrcal ynatry of cal potetral paschal oV oR .COS <br /> FM001503 PR05981]SM01 01117Q0ID <br /> E1018U1 R—W20i Pagel of Abaveg J Ptlrdam Sbra)e Ad OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.