My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -10-00 01:20 PM ELMS 9i597?347 <br />;7RR-05 9E 15:41 FROM:CAPAX CL 1 209-526-4324 T0:209 4 026 <br />INUUJ I HIAL MY UIrNt "Uh{ V t1 <br />SURVEY L0CAT10N: QBR <br />Stockton, California <br />,SURVEY DATE: February 14, 1995 <br />PERFORMED BY; Peter M. Jaramilio, CIH <br />Industrial Hygienist <br />FACILITY CONTACT: Pete Warren, Plant Manager <br />Noe Gonzalez, Production Manager <br />PURPOSE To perform personal air monitoring at the Brake Shoe Plant. <br />BACKGROUND INFORMATION: <br />P. A 1 <br />PAGE: 02 <br />At the request of management, air monitoring for asbestos and other fibers was <br />performed. The operations evaluated were: <br />♦ Caliper Core Check In ♦ Bonding <br />♦ Riveter ♦ Ce -Riveter <br />♦ ARC Grinding ♦ Blaste-!Wheelabrator <br />♦ Oe -Bonding ♦ Core Sorter <br />The operations were described by management as routine. <br />SUMMARY OF RESULTSIOBSERVATIONS/CONCLUSIONS: <br />♦ Results of the air monitoring found all eight monitored personnel to receive <br />exposures well below the recommended exposure criteria. <br />SURVEY METHOD: <br />Personal air samples for asbestos fibers were collected with SF;C sampling pumps and <br />37 mm COWL cassettes. The samples were collected at a flow rate of 2 liters per <br />minute. Calibration was performed before and after, using a Brooks Rotometer. <br />Analyses for all samples collected were performed by the Health Science Associates <br />which is accredited by the American Industrial Hygiene Association (AIHA). <br />Respectfully submitt <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.