My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QS0""1 IMPROVEMENT ACTION REQU^"T <br />IAR is IMPROVEMENT ACTION REQUEST; PAR is PREVENTIVE ACTION REQUEST; CAR is CORRECTIVE ACTION REQUEST <br />AREA/PROCESS Hazardous Waste IAR # PAR # <br />CAR # 11-041 <br />REQUEST ORIGINATOR: Tom Garing REQUEST DATE: 10/18/2011 DUE DATE: 12/6/2011 <br />NAME(S) OF ACTION REQUEST IMPLEMENTER -S): <br />EH&S Manager Jennifer Gutierrez, QA Trainer Julio Pineda <br />a. REVIEW OF THE NONCONFORMITY, STATING THE CIRCUMSTANCES OF THE NC OR OPPORTUNITY FOR IMPROVEMENT <br />San Joaquin County REHS Stacy Rivera inspected the QBR Facility on October 18th, 2011 finding the following deficiencies: 1. onsite <br />hazardous training is being conducted by persons who are lacking current training in accordance with Title 22 regulations, 2. containers <br />larger than 5 gallons that previously held a hazardous material or hazardous waste, shall be marked with the date that they were emptied <br />and managed within one year of being emptied, 3. hazardous waste containers were noted to be stored close to one another, not allowing <br />access for the inspection the drums or their labels. 4. Universal Waste containers with used batteries and empty aerosol cans had labels <br />that did not contain on the "Universal Waste" or the contents of each container (i.e. Used batteries, empty aerosol cans), 5. it is <br />recommended that the organization follow up on US Technologies handling of used shot blast media to assure that it is being handled <br />properly. <br />ACTION PROCESS STEPS: <br />b. DETERMINE THE ROOT CAUSE OF THE NONCONFORMITY OR EVALUATION OF ACTION OPPORTUNITY": <br />1. The previous EH&S Manager maintained current Hazardous Material training, however, since his departure from the organization, no <br />training had yet been completed by the new EH&S Manager, 2. The date of empiying hazardous material containers had not been <br />previously noted on the Empty Container label, 3. container storage locations need to be oreganized to allow for proper inspections, 4. <br />Universal Waste had not previously been labeled with the type of Universal waste in each of several containers, 5. follow up on the <br />handling of excluded recyclable material had not previously been conducted. <br />c. EVALUATION OF THE NEED FOR ACTION TO ENSURE THAT (ADDITIONAL) NCS DO NOT OCCUR <br />1. Training on Hazardous Waste Management has been schedule on November 8th, 2011 and November 15, 2011 for the EH&S Manager <br />and the QA Trainer Positions, 2. the Empty Container Label format has been changed to include a field for the empty date for a container <br />that previously held a Hazardous Material, 3. Hazardous Material Inspections will include observations of the placement of containers that <br />will permit proper access for container and label inspections, 4. Universal wast Label formats have been revised to include the Universal <br />Waste and the type of materials in each labeled container, 5. a follow up on each US Tech nologies shipment of excluded recyclable <br />materials will be conducter after each future shipment has been made, to assure that these materials are handled properly. <br />d. DETERMINATION OF ACTION NEED TO BE TAKEN AND IMPLEMENTATION PLAN <br />Jennifer Gutierrez and Julio Pineda attended Hazardous Waste Management training on Tuesday November 8, 2011 and Advanced <br />Hazardous Waste Management training on Tuesday November 15, 2011. QBR internal training on Hazardous Waste Management is <br />scheduled to be conducted by Julio Pineda for all affected QBR associates on Tuesday, December 6, 2011. <br />e. RECORD THE RESULTS (OR ANTICIPATED RESULTS) OF THE ACTIONS TAKEN <br />Jennifer Gutierrez and Julio Pineda are now certified to conduct Hazardous Waste Management training to all QBR <br />associates who handle Hazardous Waste. Training will be conducted initially with a yearly refresher for affected associates. <br />f. DOCUMENT THAT THE ACTIONS TAKEN HAVE BEEN REVIEWED FOR EFFECTIVENESS AND VERIFIED IN THE SPACES BELOW <br />Hazardous Waste Management training material has been updated scheduled for Tuesday December 6, 2011. QBR will document all <br />training and schedule a refresher training for 2012. <br />*NOTE - Thorough NC root cause investigations should include a 5 WHY analysis and/or a FISHBONE DIAGRAM to consider all incident <br />aspects. Sheets 2 and 3 of this file contain forms that outline the basic use of these tools. <br />SUBMITTED FOR APPROVAL BY: Julio Pineda DATE: 11/29/2011 <br />QBR QUALITY MANAGER APPROVAL: Tom Garing DATE: <br />IAR/PAR/CAR VERIFIED TO BE IMPLEMENTED AND EFFECTIVE <br />VERIFIED TO BE IMPLEMENTED AND EFFECTIVE BY DOCUMENTATION <br />VERIFIED TO BE IMPLEMENTED AND EFFECTIVE BY INSPECTION/TEST <br />[ ] REJECTED WITH REASON EXPLAINED BELOW: <br />QS0201Action Request Form Sheet <br />Rev. D VERIFIED/REJECTED BY: Jennifer Gutierrez DATE: <br />12/29/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.