Laserfiche WebLink
15671 Lower Sacramento Road Page 4 <br /> Work Plan—Soil Boring Installation <br /> GPE Project No.593 <br /> October 21,2008 <br /> 3.0 REPORTING <br /> The information gathered during this phase of work will be presented in a report, which <br /> will include the results of field data, and sample analyses, and their implications. The <br /> report will be prepared and signed by the Professional Geologist responsible for the work. <br /> 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />