My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2231-2238 – Tiered Permitting Program
>
PR0536175
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 9:43:30 AM
Creation date
3/3/2020 11:41:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0536175
PE
2231
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f--� 1534 Willow Pass Road,Pittsburg„CA 94565-1701 <br /> ' M c C a m p b e l l Analytical, Inc. Tall Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> ' "When Quality Counts" http:1Jwww.mocampbell.com 1 E-mail:imainQtnooampbeil,com <br /> s �7 <br /> WORK ORDER SUMMARY <br /> Client Name: CASTLE ANALYTICAL LABORATORY Project: 1910108/Premier Finishing)Premier Finishing Work Order: 1910E17 <br /> Client Contact: Clari Cone QC Level: LEVEL 2 <br /> Contact's Email main@castle-lab.corn; clari.cone@gmail.com Comments: STLC Ba Cr,Cu,Ag&TCLP Ba,Ag added 11/7/19 STAT. Date Logged: 10/31/2019 <br /> Date Add-On: 11/7/201.9 <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative Collection Date TAT Sediment Hold SubOut <br /> /Composites &Time Content <br /> 1910E17-003A Filter Cake Sludge SW6020(Metals)(TCLP)<Basium, 1 80Z GJ,Unpres 101291201916:35 5 days* <br /> Silver> <br /> SW6020(Metals)(STLC)<Barium, 5 days* <br /> Chromium,Copper,Silver> <br /> MOTES: -STLC and TCLP extractions require 2 clays to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample-MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 9 of? <br /> Desna R -PC <br />
The URL can be used to link to this page
Your browser does not support the video tag.