Laserfiche WebLink
Pressure Water <br /> Waste Water <br /> from outside <br /> Premier Finishing _ <br /> Schematic Flow Diagram eonizedWaterTreatment Incoming Water <br /> Process#2 chem line unit supply <br /> 9 4„ <br /> 27'1' N, 4'7 21.1' <br /> I - <br /> 2'6 <br /> TANK A TANK B TANK 1 TANK 2 TANK 3 TANK 4 TANK 5 TANK 6 TANK 7 TANK 8 TANK 9p7MNK <br /> TANK 11 TANK 12 <br /> TANK 13 TANK 14 <br /> 12'4' New iridite Running Alumate Running Deoxidizer Running 350 Gal. Hot WaterRinse MacdermidRinse do activat Rinse Etch Rinse 710 Rinse Currently Rinse Rinse NCPSupreme 35pGal. 3S0Gal. 350 Gal. 350Gal. 350 Gal. 353Gal. Empty350 Gal. 350Gal. 350Gal. 350GaL�, Q Q M.. O � � qQ Q O © O O O55 Gal. 55 Gal.36- kn 714r l li <br /> T <br /> I 1 3• <br /> Process Transfer <br /> Containment Wall—)51'4' I�9.2„ f I 4'7' —I <br /> TWx 57 Lx 4'D7dnks 1-11 3'W x S'Lx3'DTanks <br /> 30"W x S L x 30"D Tank 12 ONLY 'lank volume approximately 350 gallons(@ 7.48 gallons/R3) <br /> tanks b,2,4,6,8,9,11,13 are all running rinse tanks <br /> 3'W x5 Lx4'DTBnks 1-II&Tank 13&14 -Represents the containment wall <br /> 30"Wx 57 Lx 30"D Tank 12 ONLY <br /> ®l`mk#1 iddlte zdt activator. <br /> ©Tank#3 Alumate Etch: <br /> Qlank#5 Deoxidizer 710: <br /> (Shank#7 Empty <br /> 6 <br /> ®Tank#12 Macdenrid NCP, <br /> OTank#10 C)llectfon/Sump pump to transfer to waste water holding tanks.(on South side of bldg process#1) <br /> GTTank 914 Metal last TCP-HF. <br /> 0Tank#A New Dimensons Supreme: <br /> Note:When changing the processing chemicals Inside the tank or replenishing lost water,use deionized water. <br /> ?:\Safety and Enviromenia NEnviro\Haz Waste Treatment Permit\Process 2{hemline Conversion 08-21-2019(CY Edit 01),ai <br />