My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-PRESENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1085
>
2900 - Site Mitigation Program
>
PR0545446
>
COMPLIANCE INFO_2008-PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 3:34:46 PM
Creation date
3/3/2020 2:23:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-PRESENT
RECORD_ID
PR0545446
PE
2961
FACILITY_ID
FA0019341
FACILITY_NAME
GORDON PROPERTY
STREET_NUMBER
1085
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1085 S UNION RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br /> DTSC Calendar of Tasks <br /> Task Section Due Date <br /> Effective Date of this Order 8 5 days after the date of mailing of the <br /> Order by DTSC <br /> Submit Letter of Intent 7 Within 10 days from the effective date <br /> of this Order <br /> Identify Project Coordinator 6.1 Within 10 days from the effective date <br /> of this Order <br /> Fence Site 5.4.1 Within 10 days from the effective date <br /> of this Order <br /> Identify Project Engineer or 6.2 Within 15 days from the effective date <br /> Geologist and submit resume of this Order <br /> and Statement of Qualifications <br /> Post Warning Signs 5.4.2 Within 15 days from the effective date <br /> of this Order <br /> Provide copies of this Order to 6.25 Within 15 days from the effective date <br /> any consultants or contractor of this Order <br /> retained to provide services <br /> related to this Order <br /> Submit Monthly Summary 6.3 Within 30 days from the effective date <br /> Reports of this Order, by the 15th of each <br /> month thereafter <br /> Submit Chemical Identification 5.4.3 Within 30 days from the effective date <br /> and Disposal Plan of this Order <br /> Obtain Access to areas of the 6.10.2 Within 45 days from the effective date <br /> Site not under control of of this Order, and/or 45 days from the <br /> Respondent date it is determined that access is <br /> necessary <br /> Submit List of Interviewees for 5.7.2 Within 40 days from the date of <br /> community survey to develop the completion of the actions required in <br /> Public Participation Plan section 5.4 <br /> Submit Site Characterization 5.5 Within 60 days after completion of the <br /> orkPlan actions specified in section 5.4 <br /> Notification fo Sample Collection 6.11 7 days prior to sample collection <br /> Submittal of Sample Results 6.11 7 days after written request from DTSC <br /> Submitt Emergency Response 5.9 Within 7 days of an emergency <br /> cdon Report response action <br /> Notification of destruction of 6.12 At least six months propr to destroying <br /> documents prepared pusuant to any document required by this Order <br /> this Order <br />
The URL can be used to link to this page
Your browser does not support the video tag.