Laserfiche WebLink
,4 OTIE-Im <br /> OneWa ToW IntcgrWE Enroryrlse: • � <br /> Daily Safety Tailgate, Operations, and Environmental Compliance Meeting Form <br /> Project Name: Soil Excavation at California National Guard Armory <br /> Lodi, California <br /> Contract Number: W91238-09-D-0017, DO 0004 <br /> Date: 4/2//D <br /> SSHO: Lr/c-Sr:e- �L+t,,•�,� c,C..� ta.?-eafE'� .%�mc'S ��h z. � �_5 S u!l <br /> ITEMS TO BE DISCUSSED WITH ALL PROJECT PERSONNEL: <br /> Personal protective equipment required (hard hat, safety glasses, steel-toed <br /> boots, ear plugs, leather gloves, etc) <br /> Materials expected to be encountered on job and exposure limits (COPCs) <br /> Work zones and methods of security <br /> General safe work practices <br /> Decontamination procedures (discuss cleaning of all contaminated equipment <br /> and personnel hygiene). <br /> -4 - Emergency procedures: Call 911 <br /> First Aid procedures- Hospital: Lodi Memorial Hospital, 975 S. Fairmont Avenue, <br /> Lodi, CA 95240. Ph: (209) 334-3411. <br /> .` Emergency equipment and location: first aid kit at construction trailer and in <br /> pickup truck; Fire Extinguishers at construction trailer, in pickup trucks, or in <br /> heavy equipment. /'- <br /> ANAs reviewed <br /> d;rz/ <br /> r I�PPfS��I ' CXLuU �rvS� <br /> Other Items Discussed: 1 y <br /> r- <br /> t� �1 / d <br /> Q�1 N <br /> 3� (tea DUfr Jri%�' T� r1CL1sP_ S�'���*, ,l a)S f� OUt e� <br /> l �i � �IrQLt��IStS�, <br /> The following personnel were present for discussion of the topics listed above and have read <br /> and understand the contents of this Site Health and Safety Plan. <br /> N ME SnIAT U E COMPANY 212 <br /> TE <br /> a <br /> 69,Es1Y OLIO o <br />