Laserfiche WebLink
APP <br /> Well Installation and Sampling at California National Guard Field Maintenance Shop <br /> Stockton, California <br /> 8.0 ACCIDENT REPORTING............................................................................ 18 <br /> 8.1 RESPONSIBILITIES.................................................................................................. 19 <br /> 9.0 PLANS (PROGRAMS AND PROCEDURES) REQUIRED BY THE <br /> SAFETY MANUAL (AS APPLICABLE)......................................................20 <br /> 9.1 LAYOUT PLANS (04.A.01).......................................................................................20 <br /> 9.2 EMERGENCY RESPONSE PLANS .............................................................................20 <br /> 9.2.1 (1) Procedures and tests (01.E.01).................................................................. 20 <br /> 9.2.2 (2) Spill Plans (01.E.01, 06.A.02)..................................................................... 20 <br /> 9.2.3 Firefighting Plan (01.E.01, Section 19)............................................................ 21 <br /> 9.2.4 (4) Posting of emergency telephone numbers (01.E.05)................................. 21 <br /> 9.2.5 Man Overboard/Abandon Ship........................................................................ 24 <br /> 9.2.6 Medical Support............................................................................................... 24 <br /> 9.3 PLAN FOR PREVENTION OF ALCOHOL AND DRUG ABUSE(01.C.02) [DEFENSE <br /> FEDERAL ACQUISITION REGULATION SUPPLEMENT(DFARS) SUBPART 252.223- <br /> 7004] ................................................................................................................25 <br /> 9.4 SITE SANITATION PLAN (SECTION 02).....................................................................26 <br /> 9.5 ACCESS AND HAUL ROAD PLAN (4.B) .....................................................................26 <br /> 9.6 RESPIRATORY PROTECTION PLAN (05.G) ...............................................................26 <br /> 9.7 HEALTH HAZARD CONTROL PROGRAM (06.A).........................................................26 <br /> 9.8 HAZARD COMMUNICATION PROGRAM (06.B.01)......................................................26 <br /> 9.9 PROCESS SAFETY MANAGEMENT PLAN (06.B.04)...................................................27 <br /> 9.10 LEAD ABATEMENT PLAN (06.B.05&SPECIFICATIONS) ............................................27 <br /> 9.11 ASBESTOS ABATEMENT PLAN (06.B.05&SPECIFICATIONS) ....................................27 <br /> 9.12 RADIATION SAFETY PROGRAM(06.E.03A)..............................................................27 <br /> 9.13 ABRASIVE BLASTING(06.H.01)...............................................................................27 <br /> 9.14 HEAT/COLD STRESS MONITORING PLAN (06.1.02)...................................................27 <br /> 9.15 CRYSTALLINE SILICA MONITORING PLAN (ASSESSMENT) (06.M)..............................27 <br /> 9.16 NIGHT OPERATIONS LIGHTING PLAN (07.A.08) .......................................................27 <br /> 9.17 FIRE PREVENTION PLAN (09.A) ..............................................................................27 <br /> 9.18 WILD LAND FIRE MANAGEMENT PLAN (09.K) ..........................................................28 <br /> 9.19 HAZARDOUS ENERGY CONTROL PLAN (12.A.01) ....................................................28 <br /> 9.20 CRITICAL LIFT PLAN (16.H) ....................................................................................28 <br /> 9.21 CONTINGENCY PLAN FOR SEVERE WEATHER(19.A.03)..........................................28 <br /> 9.22 FLOAT PLAN (19.F.04)...........................................................................................29 <br /> 9.23 SITE-SPECIFIC FALL PROTECTION AND PREVENTION PLAN (21.C)............................29 <br /> 9.24 DEMOLITION PLAN (TO INCLUDE ENGINEERING SURVEY) (23.A.01)...........................29 <br /> 9.25 EXCAVATION/TRENCHING PLAN (25.A.01) ..............................................................29 <br /> 9.26 EMERGENCY RESCUE (TUNNELING) (26.A)..............................................................29 <br /> 9.27 UNDERGROUND CONSTRUCTION FIRE PREVENTION AND PROTECTION PLAN <br /> (26.D.01) ..............................................................................................................30 <br /> 9.28 COMPRESSED AIR PLAN (26.1.01)...........................................................................30 <br /> 9.29 FORMWORK AND SHORING ERECTION AND REMOVAL PLANS(27.C) ........................30 <br /> 9.30 PRECAST CONCRETE PLAN (27.D).........................................................................30 <br /> 9.31 LIFT SLAB PLANS(27.E).........................................................................................30 <br /> 9.32 STEEL ERECTION PLAN (27.F.01)...........................................................................30 <br /> 9.33 SAFETY AND HEALTH PLAN FOR HTRW WORK(SSHP) (28.B)................................30 <br /> 9.34 BLASTING SAFETY PLAN (29.A.01).........................................................................30 <br /> OTIE iii <br />