Laserfiche WebLink
ACTIVITY HAZARDS ANALYSIS <br /> Overall Risk Assessment Code(RAC) <br /> (Use highest code) I M <br /> Date: 6 November 2009 Project: Soil Excavation <br /> Risk Assessment Code Matrix <br /> Activit E=Extremely High Risk <br /> Y AHA-01 Mohilization H—High Risk Probability <br /> M=Moderate Risk Frequent Likely Occasional Seldom Unlikely <br /> Activity Location: California National Guard Armory,Lodi,CA L=Low Risk <br /> 5 Catastrophic E E H H M <br /> e <br /> Prepared By: Lik-See Chung r Critical E H H M L <br /> Marginal H M M L L <br /> Y Negligible M L L L L <br /> Add Identified Hazards <br /> JOB STEPS HAZARDS ACTIONS TO ELIMINATE OR MINIMIZE HAZARDS RAC <br /> The SSHO wi give a tailgate meeting fora personnel prior to entering <br /> Arrival to site/Site set up Being unfamiliar with site the site.This will include review of ANAs,PPE,emergency procedures M <br /> and communication protocols. <br /> Personnel will be trained to use proper lifting techniques such as <br /> keeping the back straight,lifting with legs,limiting twisting,and <br /> getting help when moving bulky/heavy materials and equipment.Use <br /> Arrival to site/Site set up Strains due to offloading of equipment of hand truck shall be encouraged. M <br /> Personnel will not lift more than 50 pounds without assistance. <br /> Equipment will be mobilized tot the site for future operations.Care must <br /> be taken while working around the equipment. <br /> Any equipment on site during mobilization shall be inspected daily,at a <br /> Arrival to site/Site set up Danger of working around heavy equipment minimum and should be in good condition with backup alarm working M <br /> properly. <br /> Only a trained operator shall drive the equipment. <br /> NWW Form 385-1 (Revised)April 2008 <br />