My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACTIVITY HAZARDS ANALYSIS <br /> Overall Risk Assessment Code(RAC) <br /> (Use highest code) I M <br /> Date: 6 November 2009 Project: Soil Excavation <br /> Risk Assessment Code Matrix <br /> Activit E=Extremely High Risk <br /> Y AHA-01 Mohilization H—High Risk Probability <br /> M=Moderate Risk Frequent Likely Occasional Seldom Unlikely <br /> Activity Location: California National Guard Armory,Lodi,CA L=Low Risk <br /> 5 Catastrophic E E H H M <br /> e <br /> Prepared By: Lik-See Chung r Critical E H H M L <br /> Marginal H M M L L <br /> Y Negligible M L L L L <br /> Add Identified Hazards <br /> JOB STEPS HAZARDS ACTIONS TO ELIMINATE OR MINIMIZE HAZARDS RAC <br /> The SSHO wi give a tailgate meeting fora personnel prior to entering <br /> Arrival to site/Site set up Being unfamiliar with site the site.This will include review of ANAs,PPE,emergency procedures M <br /> and communication protocols. <br /> Personnel will be trained to use proper lifting techniques such as <br /> keeping the back straight,lifting with legs,limiting twisting,and <br /> getting help when moving bulky/heavy materials and equipment.Use <br /> Arrival to site/Site set up Strains due to offloading of equipment of hand truck shall be encouraged. M <br /> Personnel will not lift more than 50 pounds without assistance. <br /> Equipment will be mobilized tot the site for future operations.Care must <br /> be taken while working around the equipment. <br /> Any equipment on site during mobilization shall be inspected daily,at a <br /> Arrival to site/Site set up Danger of working around heavy equipment minimum and should be in good condition with backup alarm working M <br /> properly. <br /> Only a trained operator shall drive the equipment. <br /> NWW Form 385-1 (Revised)April 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.