My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APP/SSHP <br /> Soil Excavation at California National Guard Armory <br /> Lodi, California <br /> 5.2.9 First Aid and CPR Training.............................................................................. 19 <br /> 6.0 PERSONAL PROTECTIVE EQUIPMENT ..................................................20 <br /> 6.1 GENERAL...............................................................................................................20 <br /> 6.2 LEVELS OF PROTECTION AND EQUIPMENT REQUIREMENTS......................................20 <br /> 6.2.1 Training............................................................................................................ 21 <br /> 6.2.2 Storage............................................................................................................ 21 <br /> 6.2.3 Certification...................................................................................................... 22 <br /> 6.2.4 Provisions for Limitations of Use of the Level D PPE in Temperature Extremes <br /> andHeat Stress............................................................................................ 22 <br /> 7.0 MEDICAL SURVEILLANCE ....................................................................... 23 <br /> 8.0 HEAT/COLD STRESS MONITORING........................................................25 <br /> 8.1 HEAT STRESS........................................................................................................25 <br /> 8.1.1 Heat Cramps.................................................................................................... 25 <br /> 8.1.2 Heat Exhaustion .............................................................................................. 25 <br /> 8.1.3 Heat Stroke...................................................................................................... 27 <br /> 8.1.4 Preventing Heat Stress and Monitoring........................................................... 27 <br /> 8.1.5 OTIE Monitoring Method Using Heat Index for Physiological Monitoring........ 28 <br /> 8.2 COLD STRESS........................................................................................................ 30 <br /> 9.0 STANDARD OPERATING SAFETY PROCEDURES AND CONTROLS... 31 <br /> 9.1 PERSONAL PRECAUTIONS ...................................................................................... 31 <br /> 9.2 OPERATIONAL REQUIREMENTS......:........................................................................ 31 <br /> 9.2.1 General Requirements for All Levels............................................................... 31 <br /> 9.2.2 Subcontractor Safety and Health Plans........................................................... 32 <br /> 10.0 SITE CONTROL MEASURES.....................................................................33 <br /> 10.1 GENERAL............................................................................................................... 33 <br /> 10.2 WORK ZONE DEFINITIONS AND SITE SECURITY....................................................... 33 <br /> 10.3 THE BUDDY SYSTEM..............................................................................................33 <br /> 10.4 AIR MONITORING ................................................................................................... 33 <br /> 10.4.1 Volatile Organic Compounds........................................................................... 33 <br /> 10.4.2 Calibration and Maintenance of the Real-time Aerosol Monitors..................... 34 <br /> 10.4.3 Example of the MultiRAE Plus Calibration Protocol......................................... 34 <br /> 11.0 PERSONAL HYGIENE AND DECONTAMINATION ..................................36 <br /> 11.1 GENERAL............................................................................................................... 36 <br /> 11.2 DONNING AND DOFFING PERSONAL PROTECTIVE EQUIPMENT ................................. 36 <br /> 11.2.1 Personal Hygiene/Sanitation ........................................................................... 36 <br /> 11.2.2 Medical Emergency Decontamination Procedures.......................................... 37 <br /> 12.0 EQUIPMENT DECONTAMINATION........................................................... 39 <br /> 12.1 LEVEL OF PROTECTION .......................................................................................... 39 <br /> 12.2 SPILL PREVENTION ................................................................................................ 39 <br /> OTIE ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.