Laserfiche WebLink
Priorities 5 and 6-GP-2a and GP-3a-use <br /> these locations only if others aren't available. -t- (Prod <br /> I I II <br /> Offset to the west to clear the building. ` <br /> zPriority 3-GP-4a-Locate just east of tanks <br /> —EW- 0 <br /> and as far into the corridor(alley) as possible <br /> G P-3 a' (within rig wideness constraint). May have to <br /> dControl) offset into the main traffic corridor. <br /> i e nt <br /> HXus I INU <br /> Priority 1-GP-14a-Locate the boring as far BUILDING `_ 1 'G P -4a <br /> south as reasonably possible and collect the soil <br /> sample from 10 feet,then drill several feet below -- <br /> sc <br /> the water table(to 15 or 20 feet)and collect a OVY WTR. o <br /> groundwater sample for TPHd,TPHg and BTEX <br /> GP -2a . (DO <br /> P-14a <br /> V-V <br /> -3 <br /> Specific Recoi <br /> MIR G 18a LJ ® . <br /> Priority 2-GP-la - Locate south of <br /> EYAP. AD[ <br /> i%: Priority 4-GP-18a-Offset from / center tank and east of MW-3. <br /> A�(�C location shown on map to the west to j / O O < <br /> loccleation <br /> th(on building (if necessary). f <br /> OflFT <br />