My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2900 - Site Mitigation Program
>
PR0009269
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:42:28 PM
Creation date
3/3/2020 4:40:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009269
PE
2960
FACILITY_ID
FA0004006
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
CURRENT_STATUS
01
SITE_LOCATION
2401 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 4.0 EVIPLEMENTATION SCHEDULE <br /> The schedule for implementation of this plan is presented in Figure 5. The system will be <br /> operated continuously to attain cleanup goals; however, because of uncertainties associated with <br /> hydrocarbon remediation, the schedule reflects only two years of operation. As necessary, the <br /> schedule will evaluated at that time to reflect future changes in site conditions. <br /> Modifications to the MRP will be recommended as necessary to reflect changes in site conditions <br /> and remediation systems. As portions of the site reach remediation goals, LFC will petition the <br /> RWQCB for deactivation of the appropriate remediation system. Upon achievement of all <br /> remediation goals, LFC will petition the RWQCB for a no-further-action determination for the <br /> site. <br /> Recovery and gradient control using the existing remediation system will be ongoing. The <br /> product level in well RW-5A will be measured as part of the quarterly sampling event. <br /> Assuming that product recovery is feasible in this well, product specific recovery equipment will <br /> be installed in wells RW-5A and MW-4 approximately one month after Cleanup Plan approval. <br /> After approximately two months, installation of the new extraction and monitoring/product <br /> recovery wells will be initiated. This work is anticipated to require less than one month to <br /> complete. The recovery systems in these wells are expected to operate continuously after <br /> installation. <br /> To allow time for the remediation systems to equilibrate and to account for enhanced capture <br /> provided by the new extraction well, Installation of the oxygen injection system will take place <br /> approximately one year after Cleanup Plan approval. It will be initiated downgradient of well <br /> RW-4A (if it is required in this part of the plant), followed by installation at locations <br /> downgradient of the central plant. <br /> G'eoTrans <br /> 8 <br />