• <br /> 4.0 EVIPLEMENTATION SCHEDULE <br /> The schedule for implementation of this plan is presented in Figure 5. The system will be <br /> operated continuously to attain cleanup goals; however, because of uncertainties associated with <br /> hydrocarbon remediation, the schedule reflects only two years of operation. As necessary, the <br /> schedule will evaluated at that time to reflect future changes in site conditions. <br /> Modifications to the MRP will be recommended as necessary to reflect changes in site conditions <br /> and remediation systems. As portions of the site reach remediation goals, LFC will petition the <br /> RWQCB for deactivation of the appropriate remediation system. Upon achievement of all <br /> remediation goals, LFC will petition the RWQCB for a no-further-action determination for the <br /> site. <br /> Recovery and gradient control using the existing remediation system will be ongoing. The <br /> product level in well RW-5A will be measured as part of the quarterly sampling event. <br /> Assuming that product recovery is feasible in this well, product specific recovery equipment will <br /> be installed in wells RW-5A and MW-4 approximately one month after Cleanup Plan approval. <br /> After approximately two months, installation of the new extraction and monitoring/product <br /> recovery wells will be initiated. This work is anticipated to require less than one month to <br /> complete. The recovery systems in these wells are expected to operate continuously after <br /> installation. <br /> To allow time for the remediation systems to equilibrate and to account for enhanced capture <br /> provided by the new extraction well, Installation of the oxygen injection system will take place <br /> approximately one year after Cleanup Plan approval. It will be initiated downgradient of well <br /> RW-4A (if it is required in this part of the plant), followed by installation at locations <br /> downgradient of the central plant. <br /> G'eoTrans <br /> 8 <br />