Laserfiche WebLink
Figure 5. Cleanup Plan Implemetation Schedule <br /> Months Since Cleanup Plan Approval <br /> Task 1 2 3 4 5 6 1 71 8 1 9 110111112113114115116117118119120121122 23 24 <br /> Continued Recovery Through Existing System(ongoing) <br /> Install Product Specific Recovery Pumps in Wells MW-4 and RW-5A <br /> Install New Extraction Well <br /> Operation of New Extraction Well <br /> Install New Monitoring/Product Recovery Wells <br /> Operation of New Monitoring/Product Recovery Wells <br /> Install and operate Ox en Injection Downgradient of RW-4A if necessa • <br /> Install Ox en Injection at Various Downgradient and/or Source Areas <br /> Notes: <br /> 1.MRP revisions will be recommended as necessary to reflect changes in the remediation system and site conditions. <br /> 2.Because of uncertainties associated with hydrocarbon remediation,the schedule will be revised after two years to reflect site conditions <br /> 3.As portions of the site reach remediation goals, LFC will petition the RWQCB for deactivation of the appropriate remediation system. <br /> 4. Upon achievement of all reemediation goals,LFC will petition the RWQCB for a no-further-action determination for the site. <br /> i <br />