2.2 Well Development <br /> At least 24 hours after the grout seal has been placed,the well will be developed. Initial <br /> development will consist of surging with a bailer for approximately a half hour by moving the <br /> bailer up and down. After surging,the well will be bailed or pumped for up to an additional two <br /> hours or until produced water is clear. Since this well is not to be used for potable water supply, <br /> and because of the potential presence of petroleum hydrocarbons, it will not be disinfected. <br /> 2.3 Surveying <br /> Upon completion, the elevation for well MW-17 will be surveyed by a Professional Land <br /> Surveyor,registered in the State of California to requirements that conform to GeoTracker <br /> standards. Since the well will be installed at the same location as the existing well, it will not be <br /> surveyed for horizontal location. The survey will conform to the grid system now in use at the <br /> site. <br /> 2.4 Well Nomenclature <br /> The replacement well will be referred to as MW-17A. <br /> 3.0 WASTE HANDLING <br /> All solid and liquid waste produced during well abandonment and reinstallation will be drummed <br /> as it is generated. The drill cuttings are not anticipated to be contaminated. They will be <br /> characterized and disposed in accordance with applicable regulations. <br /> Liquid wastes will be discharged to the on-site Leprino treatment system for pre-treatment before <br /> being discharged to the public water treatment system. <br /> 3 <br />