My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
27383
>
2900 - Site Mitigation Program
>
PR0004192
>
ARCHIVED REPORTS_XR0011708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 7:19:24 PM
Creation date
3/3/2020 4:48:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011708
RECORD_ID
PR0004192
PE
2951
FACILITY_ID
FA0004007
FACILITY_NAME
GLENBRIAR ESTATES/L T PEREIRA
STREET_NUMBER
27383
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
24804003
CURRENT_STATUS
02
SITE_LOCATION
27383 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX II <br /> • SOIL SAMPLING PROCEDURES <br /> Sort samples will be collected in 3- to 6-inch long brass liners using a drive-tube type <br /> sampler which will be driven into the ground using a rubber mallet The sampler will be <br /> sufficiently driven into the soil profile so as to allow no headspace in the brass liner <br /> Following retrieval, both ends of the brass liner will be covered with Teflon, securely <br /> capped with polyethylene end caps, labeled, and placed in an ice chest containing Blue Ice <br /> and kept at 4 G C for transport to the analytical laboratory for chemical analyses <br /> If soil samples cannot be safely collected from the excavation, soil samples will be collected <br /> f using the backhoe A backhoe bucket of native soil from each sample location will be <br /> taken After filling the backhoe shovel from the desired location in the bottom of the <br /> excavation, a large solid chunk of soil will be chosen for sample collection Using a hand <br /> trowel, approximately 6 inches of soil will be rapidly scraped away from the surface of the <br /> soil Soil samples will then be collected as previously described <br /> All samples collected will be labeled with the sample identifier, location, sampler's name, <br /> time and date of sample collection, and analyses requested using a black indelible marking <br /> pen All samples collected will be recorded on a Sample Management/Chain-of-Custody <br />` form which will track the sample from time of collection to delivery at the analytical <br /> laboratory All information recorded on the Sample Management/Chain-of-Custody form <br /> will be entered in ink <br /> r Before and after each subsequent soil sampling event, all sampling equipment will be <br /> cleaned Cleaning will consist of removing solid material from the sampling equipment <br /> using clear water and plastic bristle brush, washing the sampling equipment in a mixture of <br /> clear water and Liqui-Nox or Alconox (the use of phosphate based detergents will not be <br /> Y2Wd 10(wl 5) <br /> AMERICAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.