Laserfiche WebLink
SITE SAFETY WORKPLAN <br /> • <br /> GENERAL <br /> Operations that will be conducted on the site include completion of four soil borings, the <br /> • collection of soil samples and general site cleanup The procedures for collection of soil <br /> samples are described in Appendix II <br /> • The Site Safety Officer, an concert with the AEMC Industrial Hygienist, will assess the <br /> hazard of inhalation of vapors or particulate matter according to meteorological conditions <br /> and the phase of site operations, and will determine when and in what areas of the site <br /> • personnel will be required to wear respirators <br /> Onsite personnel are trained to be aware of the potential for heat stress during site <br /> operations The combination of overexertion, protective clothing, and high ambient <br /> • • temperatures could cause heat stress which can lead to dehydration of body liquids and <br /> minerals are not replaced Rest periods and replacement of body fluids by potable <br /> drinking water and electrolyte containing beverages are required to prevent heat stress <br /> • during site operations <br /> HEALTH AND SAFETY RESPONSIBILITIES FOR KEY PERSONNEL <br /> The Project Manager and the Site Safety Officer will be responsible for planning and <br /> coordinating all activities onsite and will ensure that a Tailgate Safety Meeting form, <br /> completed and signed by an AEMC Industrial Hygienist, as obtained before work begins <br /> • They will also ensure that the Tailgate Safety Meeting form as signed daily by each <br /> employee onsite and that the Health and Safety Plan is reviewed before work begins by all <br /> site operations personnel <br /> • <br /> . hShld45(ka 1) Page 3 <br /> AMERICANI <br />