Laserfiche WebLink
14 September 1998 <br /> AGE-NC Project No. 98-0454 <br /> Page 4 of 5 <br /> 3.4. REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report will be prepared <br /> presenting the findings of the investigation. The report will include a description of the work <br /> performed and results of the sampling and analysis. Conclusions and applicable recommendations <br /> will be included in the report. The report will be in a format acceptable to the PHS-EHD and the <br /> CVRWQCB, and will be reviewed and signed by a California Registered Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by, an.AGE representative under the supervision of a California <br /> Registered Geologist.Procedures for the advancement of probe borings,soil-vapor sampling,ground <br /> water sampling, equipment decontamination and sample shipment are outlined below. <br /> 4.1. PROBE BORING ADVANCEMENT <br /> Probe borings will be advanced using AGE's van-mounted Geoprobe 5400 direct-push probing unit <br /> equipped with 1.25-inch probing rods. The Geoprobe advances soil probe borings using a hydraulic <br /> or pneumatic hammer to drive soil and ground water sampling tools to specified depths. <br /> 4.2. SOIL-VAPOR SAMPLING PROCEDURES <br /> Soil probe borings.proposed for soil-vapor sampling will be advanced to 5 feet bsg. However,total <br /> depths of probe borings will be based on field observations and field screening using an organic soil- <br /> vapor monitor(OVM). Each probe boring will be advanced using a van-mounted Geoprobe 5400 <br /> probing unit equipped with 1.125-inch diameter rods. Soil-vapor samples will be collected using a <br /> Geoprobe soil vapor assembly.- <br /> The <br /> ssembly:The vapor sapling assembly consists of an expendable vapor point placed into a point holder at the <br /> bottom of a string of 1-inch diameter hollow drive rods. The assembly will be advanced to the <br /> specified depth and retracted between six inches in order to engage the expendable point into the soil <br /> and expose a column of strata from which soil-vapor can be extracted. <br /> A post run tubing adapter equipped with an O-ring to ensure a vacuum-tight seal will then be <br /> attached to a ''/<-inch diameter, single use, disposable polyethylene tubing. The sampling tube will <br /> then lowered through the center of the hollow drive rods and secured by threading into the <br /> expendable point holder. Above ground,the polyethylene..tubing will be attached to a stainless steel <br /> T-valve. This valve will then be connected to vacuum pump. <br /> Advanced GeoEnvironmental,Inc. <br />