Laserfiche WebLink
A fire extinguisher shall be available within 54 feet of the work area during all <br /> operations A first-aid kit suitable for hazardous waste sites will be located in the <br /> ' support zone, <br /> Contaminated personal protective equipment will not be removed from the site <br /> ' until properly cleaned, packaged, and labeled, <br /> • AlI personnel entering the Exclusion zone wear the proper personal protective <br /> equipment as designated in the Project Health and Safety Plan Such individuals <br /> shall be trained in the proper use and maintenance, and have been deemed <br /> physically fit by a licensed medical physician, to wear such equipment All <br /> equipment shall be inspected prior to donning For Level C and higher protection, <br /> gloves and boots shall be taped to protective clothing to ensure complete closure, <br /> ' If unanticipated hazardous materials are observed, suspected, or personnel exhibit <br /> symptoms of distress, the Health and Safety Officer shall conduct an investigation <br /> to identify the material Work may be halted and samples collected at the <br /> discretion of the Health and Safety Officer, <br /> ' The Project Manager, Health and Safety Officer, project personnel, and <br /> subcontractors shall periodically observe personnel for symptoms of distress <br /> Symptoms of distress shall include the following <br /> M ° Changes in speech patterns, <br /> ° Nervousness or excitability, <br /> ° Changes in complexion, skin discoloration, <br /> ° Changes in disposition or demeanor, <br /> Signs of incoordination, <br /> ° Excessive salivation or pupillary response <br /> All personnel are required to contact their supervisor, Project Manager, or Health <br /> and Safety Officer if they experience any ill effects, such as <br /> Headache, <br /> ° Dizziness, <br /> Blurred Vision, <br /> tHeat Stress, <br /> ° Imtation to eyes, mucous membranes, respiratory tract, or skin <br /> ' All mechanical equipment shall be parked or stored in a safe location as designated <br /> by the Project Manager at the end of each workday <br /> CA95DE-029 <br /> American Geological Services, Inc <br />