Laserfiche WebLink
Updated:1/10/0 1 1EMEDIAL OVERSIGHT PROGRAM Report#: 7540 <br /> Printed: 1/10/01 �� SITE DATA Page#: 1 <br /> Remedial Oversight Record IIRO0000354 Facility ID: FA0003590 Site Code: 1505714 RWQCB Site ID: <br /> Location <br /> .may. <br /> Site Name: MBP/BOKIDES PETROLEUM Substance: 8006619 Petroleum: y <br /> Site Contact: NICK BOKIDES District: 004-SEIGLOCK,JACK <br /> Site Address: 501 W LODI AVE Location Code: 02-LODI <br /> LODI CA 95240 <br /> Phone: 209-943-2011 Fax: Email: <br /> Case Type: A-Aquiliier polluted APN: Reported: 9127/95 <br /> Fund Source: F-Federal <br /> Assigned to: EE0000684-INFURNA Latitude: X-Coordinate: 037-310 45 Confirmed: 11/14/95 Current Status: Longitude: Y-CEmergency g Y Res ponse: <br /> ,. "77 ates&Inform ,, <br /> RP Scarch:S-Solvent RP Search Started. 6/21/95 RP Search Ended: 6/21195 <br /> Preliminary Assessment:C-Completed Preliminary Assessment Started:6/21/95 Preliminary Assessment Ended:7/5/95 <br /> Remediation Investigation:C-Completed Remediation Investigation Started:7/5/95 Remediation Investigation Ended:8123199 <br /> Remedial Action: U-Underway Remedial Action Started: 4/18/99 Remedial Action Ended: <br /> Post Remediation Monitoring: Post Remediation Monitoring Started: Post Remediation Monitoring Ended: <br /> Case Closed: Case Closed Date: <br /> Contaminated Soil left in Place: <br /> Remedial Action Taken#l:ED-Excavate&dispose Enforcement Type: 1 -NOR ISSUED <br /> Remedial Action Taken#2:AS-AIR SPARGE <br /> Enforcement Action Taken: N Enforcement Action: <br /> Remedial Action Taken#3:VE-VACUUM EXTRACTION <br /> Remedial Action Taken#4: <br /> Remedial Action Taken#5: Contract Status: 7 <br /> Federal Exempt: N <br /> Remedial Action Taken 46: Case List: <br /> Remedial Action Taken#7: <br /> LUFT Considerations: <br /> ..... . <br /> A encu : <br /> �� :... _ . <br /> mm� <br /> Interim Remediation: N Interim Remediation Date: <br /> LUSTIS Update: Last Technical Correspondence: 10/17/00 <br /> Review Status: Priority: EBUA Category: <br /> Lead Agency: L-Local Agency LOP Site(Pilot Program): ❑Y <br /> Emergency Response?: N State OES Report Filed?: N <br /> Discovery Date: How Discovered: How Stoped: <br /> Leak Started: teak Stop Date: Primary: <br /> Leak Source: T-Tank Leak Cause: U-Unknown Secondary: <br /> Excavation Started: Tertiary: <br /> _® ;;..Rett ase Substances <br /> _mm .. <br /> _. ._ <br /> __. <br /> Monitoring Wells: 5 Free Product: Dissolved Constituent: TPHg <br /> Maximum Concentrations Current Concentrations <br /> TPH-Soil: 9,600.ppm Depth to GW: 47.00'ft <br /> TPH-GW: 85,000 ppb TPH-GW: 54,000 ppb <br /> Benzene-Soil: 24 ppm <br /> Benzene-GW: 6,000.ppb Benzene-GW: 5,100.ppb <br /> MTBE-Soil: 9.2 ppm <br /> MTBE-GW: 850,ppb MTBE.-GW: 420.ppb <br /> Maximum MTBE Date: 02/24/99 <br /> Finiffdal <br /> Program Element Code: 3526-LOP GW SITE <br /> ..... ... _. _. <br /> R ponsible Patit>tes <br /> Responsible Party Record 1113:RP0000401 Responsible Party#: 1 <br /> Responsible Party Name: MEL BOKI DES PETRO INC-NICK BOK <br /> Responsible Party Address: 2191 NAVY DRIVE <br /> STOCKTON CA 95206 iesponsible Parry Phone: 209-943-2011 <br /> Responsible Party Company: LANDOWNER,UST OWNER&OP <br />