My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:09:03 AM
Creation date
3/4/2020 9:06:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> Inc . <br /> GeoEnwironrnental, <br /> w. <br /> I I October 2002 <br /> AGE-NC Project No. 98-0450 <br /> >1 Mr. Harlin Knoll <br /> SAN JOAQUIN COUNTY Environmental Health Department <br /> 304 East Weber Avenue <br /> Stockton. CA 95202 <br /> Subject: Conformation Soil Barings <br /> tile! Bol ides Petroleum <br /> 501 Nest Lodi avenue, Lodi, California <br /> Dear Mr. Knoll: <br /> At your request, frorn our 1 1 October 2002 phone conversation and t4csimile copy of the approved <br /> soil Loring permit,4(l),unced GeoEnvironmental, Inc_ has prepared the following information for the <br /> corrective action at 501 West Lodi Avenue in Lodi, California. The work plan detailing the corrective <br /> action dated 27 March 2000, has the scope for the following: <br /> • The permit to perl:orm confirmation soil sampling at the site from two soil borings. One soil <br /> baring will be located at monitoring well MW--4 and one Loring will located at the location <br /> of vapor well VW-1. Samples will be collected from fifteen feet bsg to 50 feet bsg at <br /> monitoring well BMW-4 and collected from ten feet bsg to 50 feet bsg at vapor well VW-1. <br /> See Figures 2 and 3 for boring location and section location. <br /> • The Geoprobe soil borings will be backfilled with cement through a tremmie pipe or <br /> Geoprobe rod. <br /> • Soil samples will be analyzed for chemicals listed in Section 4.9. in remedial action work plan. <br /> Ifyou have any questions or require further information,please contact our office at(209}467-1.006. <br /> Sincerely, <br /> Advanced GeoEnvironznental, Inc. <br /> 1 <br /> William Little <br /> Project Geologist <br /> 83; Shaw ltoac{, S�ackr�rn, C�aliforz�i. 97ZI j <br /> Celcph�>r�c (?(39} RC1--IUO(i FAX (209) 467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.