Laserfiche WebLink
27 March 2000 <br /> AGF-NC Project No. 98-0450 <br /> Page 3 of 19 <br /> 2A. INITIAL SITE INVESTIGATIONS <br /> lnfortnation regarding previous investigations conducted at the site was obtained from Pi-eliminai-T <br /> Site Assessment Repnw, dated October 1 L 1995, prepared by the Clearwater Group. Inc. In July 1995 <br /> two around water monitoring wells (BMW] and BMW2) were installed at the site. The wells were <br /> sampled five times between 1995 and May 1998. The greatest concentration of total petroleurn <br /> hydrocarbons as gasoline (TPH-g) and benzene, toluene, cthylbcnzenc. and total xylenes (I TFX) <br /> compounds were detected during the May 1998 quarterly ground water monitoring event. TPI I-g was <br /> detected at 12.000 micrograms per liter(jg/l)and BTEX compounds were detected at concentrations <br /> up to 1,900 ugll (xylene). <br /> 2.5. UST R1 MOVAI. <br /> ]n FehrUary 1998. three USTs and the associated product distribution system were removed from the <br /> site. Details of the UST removals and soil sampling were presented in reports by Thorp Oil to the <br /> PHS-FI ID. <br /> I Ivdrocarbons in soil were detected in the area of the former US`fs. The hydrocarbon-impacted soil <br /> was reported to be limited to the northern portion of the UST-removal area and at the western edge <br /> of the dispenser island and was encountered at a depth oft5 feet below surface grade (bsg) at 5 feet <br /> bsg. respectively. <br /> 2.6. ADDITIONAL SITV V ASSESSMENT <br /> On 28. 29 and 30 October 1998. three additional ground water monitorim, wells. two soil gas/vapor <br /> wells and Tour Soil borin-s were installed on-site. <br /> Soil boring 13MW'3 was completed as ,round water monitoring well BMW3 at the northwest edge <br /> of the site. Sol] boring 5134 was completed as ground water monitoring well BMWq in the center <br /> of'the former UST area. Soil boring BMW5 was completed as ground water monitoring well BMW5 <br /> at the eastern edge of the site. Soil borings SI35 and SB6 were advanced at the approximate ends of <br /> the lormer northern dispenser island and were completed as soil vapor extraction wells VW 1 and <br /> VW2, respectively. Additionally. soil horing SBI Was established at the northwestern eds(,c of the <br /> former UST excavation to determine if soil contamination extended laterally north of the former <br /> UST area. Soil borings SB2 and S133 were advanced at a 35" angle from vertical under the adjacent <br /> property north of the site. to determine the lateral extent of the hydrocarbon impact to soil and <br /> ground water. Soil boring S137 was established at the approximate west end of the former southern <br /> dispenser island. <br /> .-I eliwirccd eu 1.1 in i ron men I a 1.1 nc. <br />