Laserfiche WebLink
Z7 March 2000 <br /> AGE-NC' Project No. 98-0450 <br /> Pau,e 19 of 19 <br /> All Geoprobe sampling tools used IOr sample collection will be thol'oughly rinsed with clean water <br /> after being washed with a solution of Alconox. All probing rods will be cleaned prior to <br /> advancement at each probe boring location. <br /> All probe borings will be permanently sealed to prevent vertical migration of contaminants. Soil <br /> borings shall be abandoned by backfilling with cement slurry or neat cement mix from total depth <br /> to surface �orade. <br /> 5.7. REPORTING <br /> As remediation of hydrocarbon-impacted soil and ground water at this site is implemented, quarterly <br /> reports will be submitted to the PIIS-El ID and the CVRWQCB. The quarterly reports will include <br /> analytical results and field readings. and will assess remedial progress at the site. Quarterly reports <br /> wilt be reviewed and signed by a California Registered Geologist. <br /> Irh•aic•ed(:cal:nvirwmentar.lnr. <br />