Laserfiche WebLink
06 August 1999 <br /> AGE-NC Project No 98-0450 <br /> Page 3 of 3 <br /> CONCLUSIONS <br /> Based upon data collected from the site and the analysis of remediation methods provided in the <br /> CAP and this Addendum, AGE recommends the preparation of a Remedial Action Work Plan for <br /> the implementation of a combined SVE/IAS treatment system at the site The SVE system should <br /> be designed to include depth-discrete extraction wells for each lithologic unit at the site as well as <br /> a sufficient number of sparge points to allow for optimum cleanup of ground water <br /> This CAP Addendum has been prepared on behalf of Mr Nick Bokides of Mel Bokides Petroleum <br /> If you have any questions or comments, please contact our Stockton office at (209) 467-1006 <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> Robert E arty <br /> Project Geologist/Directo perations <br /> enclosure <br /> cc Mr Nick Bokides <br /> Mr Mark List- Central Valley Regional Water Quality Control Board <br /> Advanced GeoEmironmental,Inc <br />