My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012432
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
ARCHIVED REPORTS_XR0012432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:45:32 AM
Creation date
3/4/2020 9:15:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012432
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Corrective Action Plan <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br />' 1 0 INTRODUCTION I <br /> 20 BACKGROUND 1 <br />' 21 SITE DESCRIPTION 1 <br /> 22 PREVIOUS INVESTIGATIONS 1 <br />' <br /> 23 UST REMOVAL 2 <br /> 24 ADDITIONAL SITE ASSESSMENT 2 <br /> 2 4 1 Soil and Water Sample Analysis 3 <br />' 2 4 2 Hydrocarbon Impacted Soil 3 <br /> 2 4 3 Hydrocarbon Impacted Ground Water 4 <br /> 25 SITE HYDROGEOLOGIC CONDITIONS 4 <br /> 26 STRATIGRAPHY 5 <br /> 3 0 ASSESSMENT OF HYDROCARBON-IMPACTS IN SOIL AND GROUND WATER 4 <br /> 31 ON-SITE EXTENT OF HYDROCARBON IMPACT IN SOIL 5 <br /> 32 ON-SITE EXTENT OF HYDROCARBON-IMPACTED GROUND WATER 6 <br /> 40 SOIL REMEDIAL ALTERNATIVES 6 <br /> 41 EX-SITU TREATMENT 6 <br />' 411 Principles 6 <br /> 412 Feasibility 7 <br /> 413 Duration 7 <br />' 4 1 4 Estimated Cost g <br /> 42 SOIL VAPOR EXTRACTION 7 <br /> 4 2 1 Principles g <br /> 422 Requirements g <br /> 4 2 3 Monitoring Activities 9 <br /> 424 Feasibility and Soil Vapor Extraction Pilot Test 10 <br />' 4 2 5 Duration 12 <br /> 4 2 6 Estimated Cost 12 <br /> 43 IN-SITU BIOREMEDIATION 12 <br />' 43 1 Principles 13 <br /> 4 3 2 Requirements 13 <br />' <br /> 43 3 Monitoring Activities 13 T <br /> 4 3 4 Feasibility 14 <br /> 43 5 Duration 14 <br />' 4 3 6 Estimated Cost 14 <br /> AiNaxced GcoEm iron inental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.