Laserfiche WebLink
' 21 <br /> January 1999 <br /> AGE-NC Project No 98-0450 <br /> Page 8 of 8 <br />' 5 0. RECOMMENDATIONS <br /> Based upon data collected from the site, AGE recommends <br /> • Conduct quarterly monitoring and sampling The next monitoring event should be scheduled <br /> for late January 1999 <br /> • Performance of a soil-vapor extraction pilot test to determine feasibility of in-situ soil-vapor <br /> extraction <br /> 1 <br /> 1 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> 1 environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (i a monitoring wells and soil borings), and subsurface conditions may vary <br /> away from these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained In this report <br /> i <br /> 1 <br /> 1 <br /> Advanced GcoEn%ironmen gal,Inc <br /> i <br />