My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012460
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
ARCHIVED REPORTS_XR0012460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 12:55:01 PM
Creation date
3/4/2020 9:41:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012460
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 17 October 2000 <br /> AGI:-NC Project No. 98-0450 <br /> Page 3 of 7 <br /> Sampling parts were installed upstream of the vacuum blower inlet to recover influent soil-gas vapor <br /> stream samples, and downstream of the catalytic converter to recover effluent stream samples to <br /> monitor the efficiency of hydrocarbon destruction. Field measurements were recorded at re(Yular <br /> intervals throughout the pilot test and are summarized in Table 1. <br /> On 30 June 2000. a Solleco Feat 250 catalytic converter soil-vapor extraction unit (SVF) was <br /> delivered to the site by AGI;. <br /> An SVE network was installed connecting wells VW-1 through VW-1 1, monitoring well BMW-3 <br /> through BMW-5 and the SVE unit using 2-inch diameter schedule 40 PVC piping and 2-inch gate <br /> valves to control Ilow from individual wells. Additionally. each IAS well was networked to the IAS <br /> unit using 1-inch diameter schedule 40 PVC piping and 1-inch gate valves to control injected air- <br /> yolume to individual sparging wells. The piping was placed below surface grade approximately 12 <br /> inches. <br /> _ The t�,vo-inch networked SVE inlet was connected to the SVE unit. The influent line was routed <br /> through a moisture knockout vessel to a 7.5-horsepower, maximum 250 standard cubic feet pet- <br /> minute <br /> erminute (scfm) blower. An in-line Dwyer Series 647 in-line differential pressure transmitter (DPT) <br /> was installed in the 2.5-inch influent line leading into the SVF catalytic oxidation unit. This meter <br /> is monitored monthly to calculated the influent rate. <br /> On 14,lulu 2000. the electrical power source and electrical delivery lines were setup and Cite of Lodi <br /> Electrical Department conducted power on 17 July 2000. <br /> �.5. SVE START-UP <br /> The Solleco Ecat 250 SVE system began operation on 17 July 2000. The initiation of the SVE <br /> operation was observed on 20 July 2000 by representatives of the San Joaquin Unified Air Pollution <br /> Control District (APCD) and ofthe PHS-EHD. The SVE unit operation is conducted in accordance <br /> with .APCD permit N-4344-1-0. <br /> Measurement of the SVE flow rate, vacuum (potential), concentrations of the extracted soil-vapor <br /> and collection of a set of soil.-vapor samples were observed by the APCD personnel. The samples <br /> were collected to document baseline concentrations of hydrocarbon vapor in the soil-vapor extracted <br /> by the SVE network and to determine the SVF hydrocarbon destruction rate. <br /> 2.6. SOIL-VAPOR EXTRACTION <br /> -1-he SVE system was monitored weekly for the first month of operation and monthly thereafter. <br /> idvanced Geal m inmnenlal.Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.