Laserfiche WebLink
WELL MONITORINGISAMPLING <br /> FIELD DATA SHEET <br /> sknt/ C�l e.,V�r O Irl <br /> Facility - ;x 3c"�L Job#: <br /> . <br /> Address: Date: r' <br /> City: Sampler: ��'� 6O` <br /> Well ID Mme" Well Condition: <br /> Well Diameter Hydrocarbon �� Amount Bailed �_ <br /> �•7 Thickness: (producihNateri <br /> Total Depth , r.�iAL Volume r-017 3" -0.38 V a 0.66 <br /> ? Factor� 65- 1-50 12- =5.80 <br /> Depth to Water `� �•�`� -1L <br /> � -22 X VF - <br /> �'� X 3(case volume) - Estimated Purge Volume: r' foal.) <br /> Purge Disposable Bad Sampling <br /> Equipment. r Equipment: le <br /> Stack Bailer <br /> Suction Pressure Bailer <br /> Grundfos Grab Sample <br /> 41 Other: <br /> Other. <br /> Starting Time: <br /> Weather Conditions: <br /> g• S' Water Color: B o Odor; d - <br /> Sampling Time: // <br /> Purging Flowiate• -�-� Sediment Description: _Lrrt <br /> • Time: Volume: . <br /> Did well do-,water? if yes;� <br /> Tlma Volume pH ConductWlty Temperature D.O. ORP AHadnity <br /> •F (MBIL) (mV) (ppm) <br /> Qr lQal. r Q rl. 0 3 4• _�� -�-� <br /> • ��-� <br /> LABORATORY INFORMATION <br /> PRESERV.7YPE LABORATORY ANALYSES <br /> S <br /> &AM1D (9)- CONTAINER �Ma• TPH(G) <br /> S" VOAVIAL Y sEnuow <br /> MW- ifte <br /> b 6 <br /> COMMENTS: <br /> Ma�.mrtm, <br />