My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004722
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
3500 - Local Oversight Program
>
PR0508187
>
ARCHIVED REPORTS_XR0004722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:38:41 AM
Creation date
3/4/2020 10:36:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004722
RECORD_ID
PR0508187
PE
2950
FACILITY_ID
FA0007980
FACILITY_NAME
CHEVRON SERVICE STATION #9-3232
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07917039
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n ' <br /> A <br /> GETTLER-RYAN INC. <br /> FIELD METHODS AND PROCEDURES <br /> Site Safety Plan <br /> Field work performed by GettIer-Ryan Inc (GR) is conducted in accordance with GR's <br /> Health and Safety Plan (revised January 16, 1995) and the Site Safety Plan GR personnel <br /> and subcontractors who perforin work at the site are briefed on the contents of these plans <br /> prior to initiating site work The GR geologist or engineer at the site when the work is <br /> performed acts as the Site Safety Officer GR utilizes a photoionization detector (PID) to <br /> monitor ambient conditions as part of the Health and Safety Plan <br /> Collection of Soil Samples <br /> Soil borings are drilled by a California-licensed well driller A GR geologist is present to <br /> observe the drilling, collect soil samples for description, physical testing, and chemical <br /> analysis, and prepare a log of the exploratory soil boring Soil samples are collected from <br /> the soil boring with a split-barrel sampling device fitted with 2-inch-diameter, clean brass <br /> tube or stainless steel liners The sampling device is driven approximately 18 inches with <br /> a 140-pound hammer falling 30 inches The number of blows required to advance the <br /> sampler each successive 6 inches is recorded on the boring log The encountered soils are <br /> described using the Unified Soil Classification System(ASTM 2488-84)and the Munsell Soil <br /> Color Chart <br /> After removal from the sampling device, soil samples for chemical analysis are covered on <br /> both ends with teflon sheeting or aluminum foil, capped, labeled, and place in a cooler with <br /> blue ice for preservation A chain-of-custody form is initiated in the field and accompanies <br /> the selected soil samples to the analytical laboratory Samples are selected for chemical <br /> analysis based on <br /> a depth relative to underground storage tanks and existing ground surface <br /> b depth relative to known or suspected groundwater <br /> c presence or absence of contaminant migration pathways <br /> d presence or absence of discoloration or staining <br /> e presence or absence of obvious gasoline hydrocarbon odors <br /> f presence or absence of organic vapors detected by headspace analysis <br /> • A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.