My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKE
>
12686
>
2900 - Site Mitigation Program
>
PR0516329
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:48:21 AM
Creation date
3/4/2020 11:21:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516329
PE
2965
FACILITY_ID
FA0012560
FACILITY_NAME
KELLOGG GARDEN PRODUCTS
STREET_NUMBER
12686
STREET_NAME
LOCKE
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05132011
CURRENT_STATUS
01
SITE_LOCATION
12686 LOCKE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> between each use to prevent cross contamination between samples. Drilling equipment will be <br /> decontaminated prior to commencing drilling at each hole. Well construction materials will be <br /> cleaned as necessary, prior to installation. <br /> Equipment and well material decontamination will be conducted on an impermeable surface and <br /> all decontamination effluent will be contained. All surfaces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will be stored in containers certified for hazardous materials <br /> storage and disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a <br /> nonphosphate detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized <br /> water. If the equipment is for metals analysis, the initial rinse will be conducted with 0.1 N <br /> nitric acid followed by tap water and deionized water. <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment <br /> is grouped by field activity. Calibration procedures and frequency are listed by piece. <br /> Soil Borins and Well Dimensions <br /> Steel and coated cloth tape. Calibration: none. <br /> W:\Adnun\She1ls\QAQC-98.DOC <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.