Project No. JB-20100 <br /> 4 December 2000 <br /> Page 7 <br /> On-site soil generated by site grading may be used as structural fill provided <br /> the soil is free of deleterious and organic materials and is approved for use <br /> as fill by our representative. The on-site low to non-expansive soils should <br /> be moisture-conditioned, and compacted to a minimum of 90 percent <br /> relative compaction at a minimum of 2 percent over the optimum moisture <br /> content according to the latest ASTM test methods and procedures. <br /> All import fill to be placed must be compacted to a minimum relative <br /> compaction of 90 percent of the maximum dry density and moisture- <br /> conditioned to a minimum of 2 percent over the optimum moisture content <br /> according to ASTM test methods and procedures. The import fill should be <br /> non-expansive, free of deleterious materials, and meet the following <br /> requirements in Table 1. <br /> Table 1 <br /> IMPORTED MATERIAL REQUIREMENTS <br /> Sieve Size Percent Passing <br /> 6 inches (150 mm) 100 <br /> 4 inches (100 mm) 95 - 100 <br /> # 200 5 - 25 <br /> Plasticity (Pp = 12 or less <br /> Liquid Limit (LL) = 30 or less <br /> Samples of any proposed import fill planned for use on this project should <br /> be submitted to our representative for approval and appropriate testing no <br /> less than 4 working days before the expected delivery to the job site. <br /> ' For pavement areas and concrete slabs-on-grade, the upper 12 inches of <br /> subgrade soils should be scarified, moisture-conditioned as necessary, and <br /> recompacted to a minimum of 95 percent relative compaction. <br /> 1 <br /> 5.2 Foundations <br /> 5.2.1 Conventional Foundation System <br /> 1 If the earthwork recommendations included in this report are complied with, <br /> r <br /> the proposed buildings and canopy structure may be supported by <br /> J conventional foundations established on compacted, engineered fill. <br /> Settlement of the proposed structures, supported as recommended, should <br /> be less than 1 inch. Recommendations for footing depths and foundation <br /> details are included in Table 2. <br /> MKorbmacher Engineering. Inc. <br />