My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2795
>
2900 - Site Mitigation Program
>
PR0516577
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:57:24 AM
Creation date
3/4/2020 11:23:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516577
PE
2950
FACILITY_ID
FA0012687
FACILITY_NAME
CHEVRON PRODUCTS CO
STREET_NUMBER
2795
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24614013
CURRENT_STATUS
01
SITE_LOCATION
2795 S MACARTHUR RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. JB-20100 <br /> 4 December 2000 <br /> Page 7 <br /> On-site soil generated by site grading may be used as structural fill provided <br /> the soil is free of deleterious and organic materials and is approved for use <br /> as fill by our representative. The on-site low to non-expansive soils should <br /> be moisture-conditioned, and compacted to a minimum of 90 percent <br /> relative compaction at a minimum of 2 percent over the optimum moisture <br /> content according to the latest ASTM test methods and procedures. <br /> All import fill to be placed must be compacted to a minimum relative <br /> compaction of 90 percent of the maximum dry density and moisture- <br /> conditioned to a minimum of 2 percent over the optimum moisture content <br /> according to ASTM test methods and procedures. The import fill should be <br /> non-expansive, free of deleterious materials, and meet the following <br /> requirements in Table 1. <br /> Table 1 <br /> IMPORTED MATERIAL REQUIREMENTS <br /> Sieve Size Percent Passing <br /> 6 inches (150 mm) 100 <br /> 4 inches (100 mm) 95 - 100 <br /> # 200 5 - 25 <br /> Plasticity (Pp = 12 or less <br /> Liquid Limit (LL) = 30 or less <br /> Samples of any proposed import fill planned for use on this project should <br /> be submitted to our representative for approval and appropriate testing no <br /> less than 4 working days before the expected delivery to the job site. <br /> ' For pavement areas and concrete slabs-on-grade, the upper 12 inches of <br /> subgrade soils should be scarified, moisture-conditioned as necessary, and <br /> recompacted to a minimum of 95 percent relative compaction. <br /> 1 <br /> 5.2 Foundations <br /> 5.2.1 Conventional Foundation System <br /> 1 If the earthwork recommendations included in this report are complied with, <br /> r <br /> the proposed buildings and canopy structure may be supported by <br /> J conventional foundations established on compacted, engineered fill. <br /> Settlement of the proposed structures, supported as recommended, should <br /> be less than 1 inch. Recommendations for footing depths and foundation <br /> details are included in Table 2. <br /> MKorbmacher Engineering. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.