My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LORENZEN
>
1221
>
2900 - Site Mitigation Program
>
PR0527013
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 12:51:25 PM
Creation date
3/4/2020 11:51:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527013
PE
2965
FACILITY_ID
FA0018307
FACILITY_NAME
MAIN STONE PROPERTY - WSI/LLC
STREET_NUMBER
1221
Direction
W
STREET_NAME
LORENZEN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
23913003
CURRENT_STATUS
02
SITE_LOCATION
1221 W LORENZEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+! i <br /> Contents <br /> Main Stone Property — Effluent Storage and Disposal Site <br /> Hydrogeologic Investigation Workplan <br /> INTRODUCTION AND BACKGROUND................................................................................1-1 <br /> 1.1 Introduction................................................................................................. 1-1 <br /> 1.2 Relevant supporting Documentation........................................................... 1-1 <br /> 1.3 Site Soils, Geology, and Hydrogeology...................................................... 1-2 <br /> 1.3.1 Geology....................................................................................................... 1-2 <br /> 1.3.2 Shallow Soils Coverage.............................................................................. 1-2 <br /> 1.3.3 Shallow Groundwater Occurrence and Quality.......................................... 1-3 <br /> PROPOSED HYDROGEOLOGIC INVESTIGATION..............................................................2-1 <br /> 2.1 Purpose of Hydrogeologic Investigation....................................................2-1 <br /> 2.2 Groundwater and San Joaquin River Monitoring.......................................2-1 <br /> 2.2.1 Groundwater and San Joaquin River Elevation Monitoring.......................2-1 <br /> 2.2.2 Groundwater and San Joaquin River Water Quality Monitoring...............2-1 <br /> 2.3 Field and Laboratory Testing of Hydrogeologic Parameters......................2-3 <br /> 2.3.1 Soil Physical and Mineralogical Testing....................................................2-3 <br /> 2.3.2 Guelph Permeameter Testing......................................................................2-3 <br /> 2.3.3 Double Ring Infiltrometer Testing..............................................................2-3 <br /> 2.3.4 Limited Duration Pumping Tests................................................................2-4 <br /> 2.4 Groundwater Characterization and Hydrogeologic Evaluation Report......2-4 <br /> MONITORINGNETWORK.................................................................................................3-1 <br /> 3.1 Monitoring Well Locations and Rationale..................................................3-1 <br /> 3.2 Equipment Decontamination Procedures....................................................3-1 <br /> 3.3 Health and Safety Plan................................................................................3-1 <br /> 3.3.1 Personal Protective Equipment...................................................................3-1 <br /> 3.3.2 Emergency Procedures................................................................................3-1 <br /> 3.4 Regulatory Permits......................................................................................3-2 <br /> 3.5 Monitoring Well Design.............................................................................3-2 <br /> 3.6 Well Development......................................................................................3-3 <br /> 3.6 Well Disinfection........................................................................................3-4 <br /> 3.8 Surveying....................................................................................................3-4 <br /> SOIL AND WATER SAMPLING PLAN................................................................................4-1 <br /> 4.1 Soil Sampling..............................................................................................4-1 <br /> 4.2 Well Water Sampling..................................................................................4-1 <br /> 4.2.1 Water Level Measurements........................................................................4-1 <br /> 4.2.2 Purging........................................................................................................4-1 <br /> 4.2.3 Sample Collection.......................................................................................4-1 <br /> 4.2.4 Quality Assurance/Quality Control.............................................................4-2 <br /> May 2006 Main Stone Property <br /> i Effluent Storage and Disposal Site Hydrogeologic Investigation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.