My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:52:18 PM
Creation date
3/4/2020 11:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
3Q13 QSSR QRSR QMR
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
946
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO.R5-2004-0824 .4. ` <br /> SOUTH SHORE PARCELS,L&M OPERABLE UNIT <br /> CONOCOPHILLIPS PETROLEUM COMPANY;CHEVRON,U.S.A.; ` <br /> TEXACO REFINING AND MARKETING,INC.;TOSCO CORPORATION; <br /> L&M PETROLEUM COMPANY,INC.;AND MR BILLY MCKINNON <br /> VOCKTON,SAN JOAQUTN COUNTY <br /> (b) groundwater contour maps and pollutant concentration maps containing all data obtained during the <br /> previous year, <br /> (c) a discussion of the long-term trends in the concentrations of the pollutants in the groundwater <br /> monitoring wells; <br /> (d)-an analysis of whether the pollutant plume is being captured by an extraction system or is continuing <br /> to spread; <br /> (e) a description of all remedial activities conducted during the year,an analysis of their effectiveness in <br /> removing the pollutants, and plans to improve remediation system effectiveness; <br /> (f) the anticipated date for completion of cleanup activities; <br /> (g) an identification of any data gaps and potential deficiencies/redundancies in the monitoring system or <br /> reporting program; <br /> (h) if desired,a proposal and rationale for any revisions to the groundwater sampling plan frequency <br /> and/or list of analytes. <br /> The results of any monitoring done more frequently than required.at the locations specified in the MRP <br /> also shall be reported to the Regional Board. The Discharger shall implement the above monitoring <br /> program as of the date of the Order. <br /> Ordered by: aeokf f IAIC��x 4g7 <br /> '20MAS K.PINKOS,Executive O flY <br /> Tia <br /> ate) <br />
The URL can be used to link to this page
Your browser does not support the video tag.