Laserfiche WebLink
L & M OPERABLE UNIT - THIRD QUARTER 2013 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Appendix C <br /> Page 3 <br /> STANTEC CONSULTING SERVICES INC. <br /> STANDARD PROCEDURE FOR <br /> EQUIPMENT DECONTAMINATION <br /> Equipment that could potentially contact subsurface media and compromise the integrity of the <br /> samples is carefully decontaminated prior to sampling. Samplers, groundwater pumps, liners <br /> and other equipment are decontaminated in an Alconox scrub solution and double rinsed in <br /> clean tap water rinse followed by a final distilled water rinse. <br /> The rinsate and other wastewater are contained in 55-gallon California DOT-approved drums, <br /> labeled (to identify the contents, generation date and project) and stored on-site pending waste <br /> profiling and disposal. <br /> 5ta ntec <br />