Laserfiche WebLink
Project Number: SVE System Parcel 2A <br /> 211602385.600.9409 Field Data Sheet 666 West Weber Avenue <br /> Revision Date: 3/21/13 Stockton, California <br /> Part A: Treatment System Information <br /> Soil Vapor Abatement Equipment: Solleco 750 TCAT Serial Number: M1422 <br /> Blower 1 (S-2): 10 HP Roots 56- 250 acfm and 10 in. Hq maximum <br /> Blower 2 (S-3): 20 HP Roots 615- 50cfm and 1Qjp�tp maximum <br /> Telemetry: Autodialer <br /> Electrical Power: 400 Amp 120/208 V 3 Phase, 4 Wire <br /> Supplemental Fuel: Natural Gas at 5 psi <br /> Part B: Permit Information <br /> Air Permit: San Joaquin Valley APCD Permit to Operate Number N-4878 <br /> Conditions: •VOC control efficiency> 99% or VOC emmissions < 2 lbs/day <br /> -Minimum com4us>;'Qn tsmpQratum PermaD 1;44© OF <br /> -Minimum combustion temperature (catalytic) 600 OF <br /> -Monthly effluent FID samples <br /> -Collect continuous temperature readings onto floppy disk <br /> Part C: System Data <br /> Upon Arrival Upon Departure <br /> Date: 1 9 A21c-!SI <br /> Time: <br /> General Data Upon ArrivalUpon Departure <br /> System Statuss (U /Down): <br /> (S-2) Hourmeter Reading: <br /> S-3 System Status (Up/Down): <br /> S-3 Hourmeter Readin �� � <br /> Thermal Oxidizer Data Upon Arrival Upon Departure <br /> Oxidizer Setpoint (°F): Sv <br /> Operating Temperature: <br /> High Temp Setpoint: °F S <br /> Auto Dilution Set Point °F �6 Bco C 7 <br /> Oxidizer Exhaust Temperature: °F P 7 <br /> Soil Vapor Flow Data Before Adjustment After Adjustment <br /> •(S-2) Temperature °F): 17 <br /> —17 <br /> .(S-2) Vacuum (inH20): <br /> .(S-a f=low Rate scfm : 60 A. T Hsc <br /> .(S-3) Temperature (°F): Fed ,rOhxAr <br /> ,(S-3)Vacuum (inH2O): �rJ <br /> (Sid Flow_ Ratescfm : <br /> 1zrr-a /dw ern her•-�- ccs, C� i� Gr. <br /> FID Data Before Adjustment After Adjustment <br /> S-2) Well Field (p mv): <br /> S-2 Well Field With Carbon Ti my : <br /> 3) Well Field ( mv): <br /> S-3 Well Field With Carbon Ti my : _K? <br /> Effluent (p my): z�r <br /> SV-Combined my <br /> Completed By: ,ef xY�h��FIQri1�1 Date: %/* <br />