Laserfiche WebLink
Mr. James Barton,'RWQCB May 14,2008 <br /> Work Plan for Additional Site Assessment <br /> Former Dolly Madison Bakery,Stockton,California <br /> Page 13 <br /> Task 4: Report Preparation <br /> After completing the field activities and receiving the laboratory. results, Stratus will prepare <br /> a report docuinenting the findings of the additional assessment. The report will include a <br /> scaled site plan, boring logs, well details, tabulated analytical results, well survey data, and <br /> certified analytical reports. <br /> SCHEDULE <br /> Following approval of this Work Plan, well, installation permits will be secured from <br /> SJCEHD and the work will be scheduled. Approximately three to four weeks will likely be <br /> necessary for a C-57 licensed drilling contractor to become available. The report will be <br /> submitted within approximately six weeks of receiving all analytical results. <br /> If you have any questions or comments concerning this document, please contact Scott <br /> Bittinger at (530) 676-2062. <br /> Sincerely, <br /> 5TKATU5 ENVIRONMENTAL, INC. <br /> D Gr <br /> Scott G.E&Ir!z 4 " <br /> V <br /> Scott G. Bittinger,P.G. No.7477 frlin4cipaEngineer <br /> , P.E. <br /> Project Manager csj, ;. ' <br /> ��. F <br /> e OF G AL1'Cd� <br /> Attaclunents: Table 1 Drilling and Well Construction Summaiy <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Site Vicinity Map <br /> Figure 4 Geologic Cross Section A-A' <br /> Figure 5 Geologic Cross Section B-B' <br /> Figure 6 Groundwater Elevation Contour Map, Shallow Groundwater <br /> Wells, 1 st Quarter 2008 <br /> Figure 7 Groundwater Elevation Contour Map, Mid-Depth <br /> Groundwater Wells, 1 st,Quarter 2008 <br /> Figure 8 Groundwater Elevation Contour Map,Deep Groundwater <br /> Wells, 1 st Quarter 2008 <br /> Figure 9 GRO Iso-Concentration Contour Map, Shallow Groluldwater <br /> Wells, 1 st Quarter 2008 <br /> KATnnothy Kong Pror,ert\Work P12ns\Kono mayne x,orkplan.doc <br />