My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1426
>
2900 - Site Mitigation Program
>
PR0527611
>
ARCHIVED REPORTS_XR0004018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 2:29:32 PM
Creation date
3/4/2020 2:04:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004018
RECORD_ID
PR0527611
PE
2957
FACILITY_ID
FA0018709
FACILITY_NAME
FORMER DOLLY MADISON
STREET_NUMBER
1426
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503010
CURRENT_STATUS
01
SITE_LOCATION
1426 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OREGG GREGG IN SITU, INC. <br /> DW6"= Geotechnical and Environmental In Situ Testing Contractors <br /> THE PIEZO CONE PENETROMETER <br /> The electrical piezocone (CPTU) is the <br /> premier soil logging tool The CPTU provides <br /> a rapid, reliable and economic means of <br /> determining soil stratigraphy, relative density, <br /> strength and eauilibrium groundwater <br /> pressures <br /> Gregg In Situ offers a choice of 2 5, 5, 10 and <br /> 15 ton tip (Qc) capacity cones Our cones <br /> also have variable capacity friction sleeves <br /> (Fs) and pore pressure (U) The pore <br /> Tnaxial Ceophones pressure can be measured at one of 2 <br /> or Accelerometer locations, either on the face of the cone tip or <br /> (VP&vs) behind the cone tip Pore pressure <br /> y dissipation data is recorded automatically <br /> All data is displayed in real time at the ground <br /> Inclinometer(1) surface, facilitating the on site decision <br /> making process Feld data reduction, plotting <br /> Thermistor(T) and CPT interpretation can be carried out <br /> upon request <br /> Friction Sleeve(Fs) <br /> Load Cells h <br /> i <br /> + <br /> Pore Pressure <br /> Porous F Iter Transducer(U) <br /> Element <br /> Cone'iip(a.) <br /> Apo ECo <br /> Geotechnical and Environmental In Situ Testing Contractors <br /> Los Angeles Sari Francisco Houston Aiken <br /> (_ Vancouver Edmonton Salt Lake City New Jersey <br /> Tel (925)313-5800 Fax (925)313-0302 E-mail gregg@ecis com <br />
The URL can be used to link to this page
Your browser does not support the video tag.