Laserfiche WebLink
1 <br /> promptly placed in iced storage for transport to the laboratory Chain-of-custody records were <br /> initiated In the field by the geologist and accompanied the samples to a laboratory certified by the <br />' state of California to perform the analyses requested <br /> Vapor Extraction Well Construction <br />' The vapor extraction well was constructed in the boring with thread-,jousted, <br /> 2-inch-inner-diameter, Schedule 40 polyvinyl chloride (PVC) casing No chemical cements, glues, <br />' or solvents were used in well construction The screened portion of the well consisted of factory <br /> perforated casing with 0 020-inch-wide slots The annular space In the well was packed with <br /> number 3 sand to approximately 2 feet above the slotted interval A 3-foot-thick bentonite plug <br /> was added above the sand pack to prevent the cement grout from entering the well pack The <br /> remain-mg annulus was backfilled to grade with neat cement grout See Appendix B for well <br /> details sheets <br />' The well was protected with a traffic-rated, cast-aluminum utility box equipped with a metal sku-t <br /> The box has a watertight seal to protect against surface water infiltration The design of this box <br />' discourages vandalism and reduces the possibility of accidental disturbance of the well <br />' Groundwater Monitoring Well Construction <br /> The groundwater monitoring wells were constructed in the borings with thread-jointed, <br /> 2-inch-ismer-diameter, PVC casing No chemical cements, glues, or solvents were used in well <br /> construction The screened portion of the wells consisted of factory perforated casing with <br /> 0 020-inch-wide slots The well screen extends from the total depth of the well to approximately <br />' 10 feet above the groundwater surface The annular space in the wells was packed with number 3 <br /> sand to approximately 2 feet above the slotted interval A 2-foot-thick bentonite plug was added <br /> above the sand pack to prevent the cement from entering the well pack The remaining annulus <br />' was backfilled to grade with neat cement or a bentonite cement grout See Appendix B for well <br /> detail sheets <br />' The well was protected with a traffic-rated, cast-alurrunum utility box equipped with a metal skirt <br /> The box has a watertight seal to protect against surface water infiltration The design of this box <br />' discourages vandalism and reduces the possibility of accidental disturbance of the well <br /> Well Development <br /> EMCON waited a mirumum of 24 hours after well installation before develo its the groundwater <br /> developmg <br />' monitoring wells to allow the grout to seal Before developing the monitoring wells, a technician <br /> measured depths to water with an oil/water interface probe Floating product was not <br /> encountered The well was developed with a surge block and pump Well development continued <br /> until the discharge water was clear of silt and sand Clay-size sediments derived from the screened <br /> portion of the formation cannot be entirely eliminated by well development <br /> 5A['\N VJZ\260SQ6051010 1 B5 97\cJb 2 A-2 EAKOf1 <br /> 22605-101 001 Rev 0 814/97 <br />